| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Installing 700 series aluminum glass partitions |
7,63 |
M2 |
Installing 700 series aluminum glass partitions |
Health Center of Di An Regional |
|||
2 |
The SXLD 1-swing aluminum and glass door, 700 series. |
2,2 |
M2 |
The SXLD 1-swing aluminum and glass door, 700 series. |
Health Center of Di An Regional |
|||
3 |
Shoot the aluminum sheet to cover the areas that need to be covered |
11,54 |
M2 |
Shoot the aluminum sheet to cover the areas that need to be covered |
Health Center of Di An Regional |
|||
4 |
Remove the old aluminum doors from the operating room |
1 |
Female |
Remove the old aluminum doors from the operating room |
Health Center of Di An Regional |
|||
5 |
The SXLD 2-door aluminum and glass system, model 700 |
2,77 |
M2 |
The SXLD 2-door aluminum and glass system, model 700 |
Health Center of Di An Regional |
|||
6 |
SXLD 700 series aluminum glass wall system |
51,48 |
M2 |
SXLD 700 series aluminum glass wall system |
Health Center of Di An Regional |
|||
7 |
Removing the 700 series aluminum glass wall |
7,7 |
M2 |
Removing the 700 series aluminum glass wall |
Health Center of Di An Regional |
|||
8 |
Installing 700 series aluminum glass walls||<hy_end▁of▁sentence |
7,7 |
M2 |
Installing 700 series aluminum glass walls||<hy_end▁of▁sentence |
Health Center of Di An Regional |
|||
9 |
Addition of aluminum glass wall SXLD |
7,57 |
M2 |
Addition of aluminum glass wall SXLD |
Health Center of Di An Regional |
|||
10 |
SXLD 2-door aluminum and glass door, 700 series |
2,77 |
M2 |
SXLD 2-door aluminum and glass door, 700 series |
Health Center of Di An Regional |
|||
11 |
SXLD 2-door aluminum and glass door, 700 series |
2,77 |
M2 |
SXLD 2-door aluminum and glass door, 700 series |
Health Center of Di An Regional |
|||
12 |
SXLD 2-door aluminum and glass door, 700 series |
2,77 |
M2 |
SXLD 2-door aluminum and glass door, 700 series |
Health Center of Di An Regional |
|||
13 |
SXLD 2-door aluminum and glass door, 700 series |
2,77 |
M2 |
SXLD 2-door aluminum and glass door, 700 series |
Health Center of Di An Regional |
|||
14 |
Hangzhou Jiaxing Anhui Jiangsu Zhejiang Province Hangzhou 1 Hangzhou 2 Hangzhou Gaoxin District Hangzhou Xiaoshan District Xiaoshan District 999999999999999999 |
10 |
M2 |
Hangzhou Jiaxing Anhui Jiangsu Zhejiang Province Hangzhou 1 Hangzhou 2 Hangzhou Gaoxin District Hangzhou Xiaoshan District Xiaoshan District 999999999999999999 |
Health Center of Di An Regional |
|||
15 |
Plaster patching for wall tiles |
5 |
M2 |
Plaster patching for wall tiles |
Health Center of Di An Regional |
|||
16 |
Installing 700 series aluminum glass partitions |
7,63 |
M2 |
Installing 700 series aluminum glass partitions |
Health Center of Di An Regional |
|||
17 |
Shoot the aluminum sheet to cover the areas that need to be covered |
8,64 |
M2 |
Shoot the aluminum sheet to cover the areas that need to be covered |
Health Center of Di An Regional |
|||
18 |
Replace the 2-door aluminum and glass door of the 700 series. |
2,77 |
M2 |
Replace the 2-door aluminum and glass door of the 700 series. |
Health Center of Di An Regional |
|||
19 |
Replace the 2-door aluminum and glass door of the 700 series. |
2,77 |
M2 |
Replace the 2-door aluminum and glass door of the 700 series. |
Health Center of Di An Regional |
|||
20 |
Replace the 2-door aluminum and glass door of the 700 series. |
2,77 |
M2 |
Replace the 2-door aluminum and glass door of the 700 series. |
Health Center of Di An Regional |
|||
21 |
Replace the 2-door aluminum and glass door of the 700 series. |
2,77 |
M2 |
Replace the 2-door aluminum and glass door of the 700 series. |
Health Center of Di An Regional |
|||
22 |
Replace the 2-door aluminum and glass door of the 700 series. |
2,77 |
M2 |
Replace the 2-door aluminum and glass door of the 700 series. |
Health Center of Di An Regional |
|||
23 |
Shoot the aluminum sheet to cover the areas that need to be covered |
5,82 |
M2 |
Shoot the aluminum sheet to cover the areas that need to be covered |
Health Center of Di An Regional |
|||
24 |
SXLD automatic sliding glass doors with 10mm thick tempered glass|<⦆hy_Topic|>Building Materials<|<⦆hy_Categories|>Windows and Doors<|<⦆hy_Subcategories |
7,04 |
M2 |
SXLD automatic sliding glass doors with 10mm thick tempered glass|<⦆hy_Topic|>Building Materials<|<⦆hy_Categories|>Windows and Doors<|<⦆hy_Subcategories |
Health Center of Di An Regional |
|||
25 |
Automatic sliding door accessories SXLD |
2 |
Set |
Automatic sliding door accessories SXLD |
Health Center of Di An Regional |
|||
26 |
Installing antibacterial vinyl wall panels (1mm thick) |
97,39 |
M2 |
Installing antibacterial vinyl wall panels (1mm thick) |
Health Center of Di An Regional |
|||
27 |
The installation of aluminum L-brackets completes the upper edge of the wall |
55,65 |
M |
The installation of aluminum L-brackets completes the upper edge of the wall |
Health Center of Di An Regional |
|||
28 |
Installing antibacterial vinyl floor tiles (2mm thick) |
61,69 |
M2 |
Installing antibacterial vinyl floor tiles (2mm thick) |
Health Center of Di An Regional |
|||
29 |
Applying wall paint using oil paint |
108,52 |
M2 |
Applying wall paint using oil paint |
Health Center of Di An Regional |
|||
30 |
Hidden framework SXLD ceiling panels |
61,69 |
M2 |
Hidden framework SXLD ceiling panels |
Health Center of Di An Regional |
|||
31 |
Installing antibacterial vinyl floor tiles (2mm thick) in the operating rooms (1 + 2) |
87,09 |
M2 |
Installing antibacterial vinyl floor tiles (2mm thick) in the operating rooms (1 + 2) |
Health Center of Di An Regional |
|||
32 |
Install trim around the floor of the operating room (1 + 2) |
54,39 |
M |
Install trim around the floor of the operating room (1 + 2) |
Health Center of Di An Regional |
|||
33 |
Installing antibacterial vinyl sheeting (1mm thick) in the operating rooms (1 + 2) |
176,77 |
M2 |
Installing antibacterial vinyl sheeting (1mm thick) in the operating rooms (1 + 2) |
Health Center of Di An Regional |
|||
34 |
Applying oil paint to ceilings |
87,09 |
M2 |
Applying oil paint to ceilings |
Health Center of Di An Regional |
|||
35 |
Repairing leaks, rearranging tiles on the roof, replacing broken tiles, repairing the gypsum ceiling in the operating room of about 40 m2 |
1 |
Package |
Repairing leaks, rearranging tiles on the roof, replacing broken tiles, repairing the gypsum ceiling in the operating room of about 40 m2 |
Health Center of Di An Regional |
|||
36 |
The SXLD 2-door swing aluminum and glass door system, model 700 |
3,43 |
M2 |
The SXLD 2-door swing aluminum and glass door system, model 700 |
Health Center of Di An Regional |
|||
37 |
The SXLD 2-door swing aluminum and glass door system, model 700 |
3,43 |
M2 |
The SXLD 2-door swing aluminum and glass door system, model 700 |
Health Center of Di An Regional |
|||
38 |
The SXLD 2-door swing aluminum and glass door system, model 700 |
3,43 |
M2 |
The SXLD 2-door swing aluminum and glass door system, model 700 |
Health Center of Di An Regional |
|||
39 |
Replace the grout with new grout for the tile floor |
39,33 |
M2 |
Replace the grout with new grout for the tile floor |
Health Center of Di An Regional |
|||
40 |
Remove the existing 100mm thick wall, remove the plumbing fixtures, transport the rubble to the disposal site, and apply finish plaster to the edges of the 100mm thick wall. |
18,6 |
M2 |
Remove the existing 100mm thick wall, remove the plumbing fixtures, transport the rubble to the disposal site, and apply finish plaster to the edges of the 100mm thick wall. |
Health Center of Di An Regional |
|||
41 |
Remove the old plumbing fixtures, and apply plaster to finish the edges of the walls with a thickness of 100mm |
1 |
Package |
Remove the old plumbing fixtures, and apply plaster to finish the edges of the walls with a thickness of 100mm |
Health Center of Di An Regional |
|||
42 |
Cut through the wall to remove the old windows and turn them into entrances, transport the plywood to the disposal site, and apply plaster to finish the edges of the wall with a thickness of 100mm |
2,77 |
M2 |
Cut through the wall to remove the old windows and turn them into entrances, transport the plywood to the disposal site, and apply plaster to finish the edges of the wall with a thickness of 100mm |
Health Center of Di An Regional |
|||
43 |
Cut through the wall to remove the old windows and turn them into entrances, transport the plywood to the disposal site, and apply plaster to finish the edges of the wall with a thickness of 100mm |
2,77 |
M2 |
Cut through the wall to remove the old windows and turn them into entrances, transport the plywood to the disposal site, and apply plaster to finish the edges of the wall with a thickness of 100mm |
Health Center of Di An Regional |
|||
44 |
Installing glass panels |
0,96 |
M2 |
Installing glass panels |
Health Center of Di An Regional |
|||
45 |
Remove the old concrete sink base, transport the rubble to the disposal site, and apply finishing plaster to the wall edges with a thickness of 100mm. |
1,7 |
M |
Remove the old concrete sink base, transport the rubble to the disposal site, and apply finishing plaster to the wall edges with a thickness of 100mm. |
Health Center of Di An Regional |
|||
46 |
Cut through the wall to create an entrance, transport the timber to the disposal site, and apply plaster to finish the edges of the wall with a thickness of 100mm |
2,77 |
M2 |
Cut through the wall to create an entrance, transport the timber to the disposal site, and apply plaster to finish the edges of the wall with a thickness of 100mm |
Health Center of Di An Regional |
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor TRUNG TÂM Y TẾ KHU VỰC DĨ AN:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding TRUNG TÂM Y TẾ KHU VỰC DĨ AN:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.