Calibration, maintenance, equipment maintenance in 2025

Find: 17:21 02/10/2025

Bid info

Project name/purchase estimate
Calibration service, maintenance, equipment maintenance in 2025
Bid name
Calibration service, maintenance, equipment maintenance in 2025

Basic information of the request for quotation

Request for quotation code
RQ2500014989-00
Status
Posted
Name of request for quotation
Calibration, maintenance, equipment maintenance in 2025
Address of the unit requesting a quote
Address of the unit requesting a quote (After merge)
Khuat Duy Tien Street, Group 3, Phường Tô Hiệu, Province Sơn La
Categorize quotation requests
Other goods and services bidding packages

Contact information of the person responsible for receiving the quotation

Full Name
Lò Thị Chăm
Position
Vice president
Phone number
Address
Khuat Duy Tien Street, Group 3, To Hieu Ward, Son La Province.

How to receive quotation

Form of receiving quotation
Offline
Location of request for quotation
http://muasamcong.mpi.gov.vn
Quotation acceptance time
Since 02/10/2025 17:21 To date 10/10/2025 15:00
Validity period of quotation
90 Day kể từ ngày 10/10/2025 15:00
Request for quotation
 

Content of request for quotation

Filter data

data/page
No List of product/services Quantity Unit Description Location Specification Note Feature
1
Analysis: Mettler Toledo AB 204
1
Female
Calibrated all ladder
Medicine, cosmetic and food testing center in Son La province
2
Analysis: Mettler Toledo MS 204
1
Female
Calibrated all ladder
As above
3
Analysis: Mettler Toledo Me 204
1
Female
Calibrated all ladder
As above
4
Analysis of Denver TB 224
1
Female
Calibrated all ladder
As above
5
Analysis of Ohaus (EP 214)
1
Female
Calibrated all ladder
As above
6
Jadever electronic engineering scales
1
Female
Calibrated all ladder
As above
7
High -performance liquid chromatography HPLC Agilent 1260
1
Female
Calibration on 1 detector: - Flow speed accuracy -The accuracy of the solvent mixer (03 A-B, A-C, A-D) - The accuracy of the furnace temperature - System repetition - Linear volume of injection - Linear system
As above
8
Waters Alliance E 2695
1
Female
Calibration on 1 detector: - Flow speed accuracy - Gradient accuracy - The accuracy of the furnace temperature - Repeatedly - Linear degree
As above
9
UV-VIS spectroscopy (Thermo Nicolet Evolution 300)
1
Female
Calibration: The accuracy of the wavelength. Accuracy of absorption
As above
10
UV-VIS spectroscopy (Shimadzu UV 1800)
1
Female
Calibration: The accuracy of the wavelength. Accuracy of absorption
As above
11
Solubility test machine 6-8 positions (PT-DT7)
1
Female
Calibration: Temperature accuracy Stir speed accuracy The accuracy of time counter
As above
12
Electrollab EDT-08LX (Electrollab EDT-08LX)
1
Female
Calibration: Temperature accuracy Stir speed accuracy. The accuracy of time counter
As above
13
Sanaky refrigerator
2
Female
Calibration at the thermal range 2-8 degrees Celsius
As above
14
Moisture (Testo 608 - H2)
3
Female
Calibration at four heat points 15, 20, 25, 30 degrees Celsius Humidity: 40, 60, 75 %
As above
15
Moisture (tanita)
2
Female
Calibration at four heat points 15, 20, 25, 30 degrees Celsius Humidity: 40, 60, 75 %
As above
16
Eyela dryer NDO 420
1
Female
Calibration at three heat points 70, 105, 160 degrees Celsius
As above
17
MOV-212 dryer
1
Female
Calibration at three heat points 70, 105, 160 degrees Celsius
As above
18
JSOF 153P dryer
1
Female
Calibration at 90 degrees heat C; 105 degrees Celsius
As above
19
Hirayama steamer HVE 50
2
Female
Calibration at a 121 -degree heat point C
As above
20
Mir 254 refrigerator
1
Female
Calibration at two heat points 25, 30 degrees Celsius
As above
21
Wedco kettle
1
Female
Calibration at three heat points 30, 37, 44 degrees Celsius
As above
22
JSGI warm cabinet 153 p
1
Female
Calibration at three heat points 30, 37, 44 degrees Celsius
As above
23
JSGI 100P warm cabinet
1
Female
Calibration at three heat points 30, 37, 44 degrees Celsius
As above
24
Sanyo-SR 13M refrigerator
1
Female
Calibration at the thermal range 2-8 degrees Celsius
As above
25
Level II biological cabinet 1386
1
Female
Calibration: the efficiency of the HEPA filter; The speed and uniformity of the gas flow; Light intensity and noise level; Purple light leakage and illumination
As above
26
Metrohm 827 pH
1
Female
Calibration: pH accuracy (4,7,10)
As above
27
Con Ke
1
Female
Calibration: measuring range: 0-50 %Vol
As above
28
Haloes caliper sterile ring meter
1
Female
Calibrated all ladder
As above
29
200g standard weight
1
Female
Volume calibration calibration
As above
30
Glass thermometer from 0 degrees C to 100 degrees Celsius
1
Female
Total calibration
As above
31
Glass thermometer from -10 degrees C to 110 degrees Celsius
1
Female
Total calibration
As above
32
Micropipet single channel strip 20 µl - 200 µl
1
Female
Calibration: at 90 µl; 100 µl
As above
33
Micropipet single channel strip 20 µl - 200 µl
1
Female
Calibration: at 200 µl; 100 µl
As above
34
Micropipet single channel range 1 µl - 1000 µl
2
Female
Calibration: at 100 µl; 1000 µl
As above
35
Microscope 2 Glasses (Pink MC 50 Micros, Manufacturer: Micros-Austria, serial number: 2-400960)
1
Female
Calibrated all ladder
As above
36
Agilent 1260 high -performance liquid chromatography
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the system "PAS" SELFTEST mode; Check the feedback of the control unit (buttons, touch, knob); The display and warning department (LCD screen, LED, Buzz ...); Check the functions of the system (pump, heating, rotary motor, lifting axis ...); Check the functions of the system (heating, probes ...); Check software activities, device warning functions. External maintenance: Cleaning the area of ​​equipment, equipment surface; Check the outer surface, the status of the connection port; External surface check, keyboard surface status, display screen, computer system and warning sensor system; Check the outer surface and clean the solvent filter (ultrasound with water solvent> isopropyl> water) minimize 5 minutes for each stage. Inner maintenance: Examining the exterior of the capillary wire system (capillary wiring system, no connector without the phenomenon of breaking, broken and leaked solvent); Check the exterior and clean the heat load system of the modules; External surface testing and circuit board hygiene; Inspect and maintain the system movement system; Check out and clean the probe system; Run wash the whole system with water solvents> isopropyl> Water) Single channel minimum 10 minutes for each stage, according to the program: column: capillary, current rate [1 ÷ 2] ml/minute Hygiene, maintenance of Pump systems (including pump system, mixer, conductor, bottle bottle ...), detector, - Check the stability of the device. Review linear, repeat After sanitation, maintenance, conduct the operation of the device:
As above
37
Waters Alliance E 2695
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the system "PAS" SELFTEST mode; Check the feedback of the control unit (buttons, touch, knob); The display and warning department (LCD screen, LED, Buzz ...); Check the functions of the system (pump, heating, rotary motor, lifting axis ...); Check the functions of the system (heating, probes ...); Check software activities, device warning functions. External maintenance: Cleaning the area of ​​equipment, equipment surface; Check the outer surface, the status of the connection port; External surface check, keyboard surface status, display screen, computer system and warning sensor system; Check the outer surface and clean the solvent filter (ultrasound with water solvent> isopropyl> water) minimize 5 minutes for each stage. Inner maintenance: Examining the exterior of the capillary wire system (capillary wiring system, no connector without the phenomenon of breaking, broken and leaked solvent); Check the exterior and clean the heat load system of the modules; External surface testing and circuit board hygiene; Inspect and maintain the system movement system; Check out and clean the probe system; Run wash the whole system with water solvents> isopropyl> Water) Single channel minimum 10 minutes for each stage, according to the program: column: capillary, current rate [1 ÷ 2] ml/minute Hygiene, maintenance of Pump systems (including pump system, mixer, conductor, bottle bottle ...), detector, - Check the stability of the device. Review linear, repeat After sanitation, maintenance, conduct the operation of the device:
As above
38
UV-VIS spectroscopy (Thermo Nicolet Evolution 300)
1
Female
Maintenance and maintenance: Pre -maintenance inspection: Checking the structure of farming sources, connecting equipment to appropriate farming sources; Check the operation structure of the device, key, and connect ports. - External inspection: hygiene around the device; check and clean the connection ports; Clean the keyboard, the display screen and the sample optical lid. - Maintenance of sample measuring compartment: Cleaning cuvert surface racks; Cleaning the measuring compartment, cleaning the transmission door; Clean the sample tray. - Maintenance of light cavity: Cleaning the compartment; Cleaning the transmission door, checking and cleaning light source lights; Check, hygiene parallel to heat, unanimous fans. - Maintenance of optical cavity: Hygiene of compartments, hygiene and hygiene, reflected mirrors.
As above
39
UV-VIS spectroscopy (Shimadzu UV 1800)
1
Female
Maintenance and maintenance: Pre -maintenance inspection: Checking the structure of farming sources, connecting equipment to appropriate farming sources; Check the operation structure of the device, key, and connect ports. - External inspection: hygiene around the device; check and clean the connection ports; Clean the keyboard, the display screen and the sample optical lid. - Maintenance of sample measuring compartment: Cleaning cuvert surface racks; Cleaning the measuring compartment, cleaning the transmission door; Clean the sample tray. - Maintenance of light cavity: Cleaning the compartment; Cleaning the transmission door, checking and cleaning light source lights; Check, hygiene parallel to heat, unanimous fans. - Maintenance of optical cavity: Hygiene of compartments, hygiene and hygiene, reflected mirrors.
As above
40
Solubility test machine (PT-DT7)
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the response of the keys; Check the functions of the system (pump, heating, rotary motor, lifting axis ..); Check software activities, device warning functions. - External maintenance and hygiene of circuit boards: San surface hygiene around the device (above, below, side and back of the device), equipment area; check the appearance, status and hygiene reinforcing connectors; Check the outer surface, status and keyboard hygiene, display screen. - Maintenance of heating unit: Examination of external surface, hygiene of heat circulation system, check the status of valve locks, circulation pipes. - Maintenance of motor system: Examination check, motor system, transmission axis; Maintenance of motor systems, lifting shafts, transmission systems. - Check the accuracy and frequency of fluctuations
As above
41
Electrollab EDT-08LX)
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the response of the keys; Check the functions of the system (pump, heating, rotary motor, lifting axis ..); Check software activities, device warning functions. - External maintenance and hygiene of circuit boards: San surface hygiene around the device (above, below, side and back of the device), equipment area; check the appearance, status and hygiene reinforcing connectors; Check the outer surface, status and keyboard hygiene, display screen. - Maintenance of heating unit: Examination of external surface, hygiene of heat circulation system, check the status of valve locks, circulation pipes. - Maintenance of motor system: Examination check, motor system, transmission axis; Maintenance of motor systems, lifting shafts, transmission systems. - Check the accuracy and frequency of fluctuations
As above
42
Sanaky refrigerator
2
Female
Maintenance and maintenance: External inspection: Equipment information. Maintenance: Technical inspection of heat system: Settings system display operating; The heating system is active. Maintenance above the device: cleaning on the roof or lid above the device. Maintenance inside the working compartment: Checking and hygiene for convections naturally; Check the sanitation of frames, drawers, and heat blowing compartments; Checking the anticoagulant system, anti -freezing; Sensor hygiene inspection; test heating system; Hygiene and hygiene of heating system; cleaning the working compartment and wheels, brackets ...; Hygiene of heat -conducting compartments, cooling fans, heat dispersion fans; checking the lighting system; Check the sanitation of the device's installation system. Maintenance behind the device: cleaning the surface of the device; Cleaning the cooling system of the device; Clean the wastewater discharge system. Maintenance outside the device: Cleaning around the device Temperature accuracy Operating characteristics
As above
43
Eyela dryer NDO 420
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the conformity with technical requirements of parts, shapes, models ...; check equipment information, instructions for thick and clear use; Checking the structure of farming sources, connecting equipment to appropriate farming sources, turning on the source, checking the operating structure of the display, the key, the connection ports; Check the operating status of the sensor motor; Assessment of equipment status. - External maintenance: Cleaning the surface around the device (above, below, on the side and behind the device), the area where the device is placed in the external surface test, the condition and hygiene, reinforcing the connection ports. - Maintenance of the area above the cabinet: Checking, hygiene and protection, door adjustment doors (input); Checking and reinforcing the power source connection to motor, motor movement, motor regulating system; check and clean the rough filter, added an appendage; Check, sanit Sensor wind speed. - Internal maintenance: Checking and cleaning the wind cavity; check and clean motor, rotor, suction cage; check and clean the surface of HEPA filters; Cable check, Motor hygiene. - Maintenance of working areas: Checking and cleaning the protective mesh and the surface of HEPA filters; Checking for lighting systems, UV (light bulbs, tanfo, electrical connections, switches ..); Check, hygiene around the working compartment and door frame, safe sensor, switch sensor. - Maintenance of the area below: Check and hygiene of rough filter surface; Check and clean power connections to motor, motor starting parts, wind sensor, speed ... - Maintenance of the rear area: Checking, hygiene of cable connection, opposite motor hygiene, counterweight plate; Hygiene test behind the back of the device has a poly. - Maintenance of the control system: Checking and cleaning the keyboard, the connections. - Post -maintenance test: noise test; Check the wind speed through the door; check the wind speed down the working compartment surface; light illuminance down to the working surface (background light) (Lux); testing the visible lighting at the working surface; Filter efficiency testing; Test purple light intensity.
As above
44
MOV-212 dryer
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the conformity with technical requirements of parts, shapes, models ...; check equipment information, instructions for thick and clear use; Checking the structure of farming sources, connecting equipment to appropriate farming sources, turning on the source, checking the operating structure of the display, the key, the connection ports; Check the operating status of the sensor motor; Assessment of equipment status. - External maintenance: Cleaning the surface around the device (above, below, on the side and behind the device), the area where the device is placed in the external surface test, the condition and hygiene, reinforcing the connection ports. - Maintenance of the area above the cabinet: Checking, hygiene and protection, door adjustment doors (input); Checking and reinforcing the power source connection to motor, motor movement, motor regulating system; check and clean the rough filter, added an appendage; Check, sanit Sensor wind speed. - Internal maintenance: Checking and cleaning the wind cavity; check and clean motor, rotor, suction cage; check and clean the surface of HEPA filters; Cable check, Motor hygiene. - Maintenance of working areas: Checking and cleaning the protective mesh and the surface of HEPA filters; Checking for lighting systems, UV (light bulbs, tanfo, electrical connections, switches ..); Check, hygiene around the working compartment and door frame, safe sensor, switch sensor. - Maintenance of the area below: Check and hygiene of rough filter surface; Check and clean power connections to motor, motor starting parts, wind sensor, speed ... - Maintenance of the rear area: Checking, hygiene of cable connection, opposite motor hygiene, counterweight plate; Hygiene test behind the back of the device has a poly. - Maintenance of the control system: Checking and cleaning the keyboard, the connections. - Post -maintenance test: noise test; Check the wind speed through the door; check the wind speed down the working compartment surface; light illuminance down to the working surface (background light) (Lux); testing the visible lighting at the working surface; Filter efficiency testing; Test purple light intensity.
As above
45
JSOF 153P dryer
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the conformity with technical requirements of parts, shapes, models ...; check equipment information, instructions for thick and clear use; Checking the structure of farming sources, connecting equipment to appropriate farming sources, turning on the source, checking the operating structure of the display, the key, the connection ports; Check the operating status of the sensor motor; Assessment of equipment status. - External maintenance: Cleaning the surface around the device (above, below, on the side and behind the device), the area where the device is placed in the external surface test, the condition and hygiene, reinforcing the connection ports. - Maintenance of the area above the cabinet: Checking, hygiene and protection, door adjustment doors (input); Checking and reinforcing the power source connection to motor, motor movement, motor regulating system; check and clean the rough filter, added an appendage; Check, sanit Sensor wind speed. - Internal maintenance: Checking and cleaning the wind cavity; check and clean motor, rotor, suction cage; check and clean the surface of HEPA filters; Cable check, Motor hygiene. - Maintenance of working areas: Checking and cleaning the protective mesh and the surface of HEPA filters; Checking for lighting systems, UV (light bulbs, tanfo, electrical connections, switches ..); Check, hygiene around the working compartment and door frame, safe sensor, switch sensor. - Maintenance of the area below: Check and hygiene of rough filter surface; Check and clean power connections to motor, motor starting parts, wind sensor, speed ... - Maintenance of the rear area: Checking, hygiene of cable connection, opposite motor hygiene, counterweight plate; Hygiene test behind the back of the device has a poly. - Maintenance of the control system: Checking and cleaning the keyboard, the connections. - Post -maintenance test: noise test; Check the wind speed through the door; check the wind speed down the working compartment surface; light illuminance down to the working surface (background light) (Lux); testing the visible lighting at the working surface; Filter efficiency testing; Test purple light intensity.
As above
46
2 times distilled water machine
2
Female
Maintenance and maintenance: Pre -maintenance test: Check the response of the keys; check the functions of the system (system, pump system ..); Check software operations of device warning functions. - Perform maintenance: Cleaning, cleaning the working area and around the equipment surface; Clean the water valve, pipe, input water filter; Clean the connection valve; check the status and hygiene of burning rods; check the status and hygiene of glass; check the status of the probe; Check water float hygiene
As above
47
Hirayama HVE 50 (50 liters)
2
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection: Settings system displaying operations; The heating system is active. - Hygiene outside the device: close hygiene; Safety valve and sensor examination; Check the display screen hygiene, Settings key system. - Cleaning the working compartment: Cleaning in the heart of the device; Hygiene of thermal probes, pressure gauges; hygiene of heat resistance, resistance protection lid; Check cleaning ron, lid; Check the hygiene of valves, lock lids ... - Hygiene inside the device: checking the motherboard hygiene, hourly clock, protective clock, Role ...; Examining hygiene of overheating system; hygiene of exhaust pipes, wastewater tanks; check and hygiene of water cooling system; check water float hygiene; check steam and pressure pipelines; Water supply valve hygiene; Clean the pressure pipe pressure, magnetic valves; Check pressure gauges, safety valves.
As above
48
Mir 254 refrigerator
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance above the device: cleaning on the lid or lid above the device; Check, clean the key system, install the device; check and clean the donation system of the device; control and hygiene of control boad; Check the source system hygiene. - Maintenance inside the working compartment: Checking and cleaning the convection tubes naturally; Checking and cleaning frames, drawers, and heating compartments; check and clean the aluminum radiator; test heating system; check the heating system; Cleaning the working compartment and wheels, brackets ... - Maintenance behind the device: cleaning the surface of the device's back - Maintenance outside the device: Cleaning around the device. - Check the temperature after maintenance - Temperature accuracy
As above
49
Wedco kettle
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance above the device: cleaning on the lid or lid above the device; - Maintenance inside the working compartment: Checking and sanitation maintenance inside the working compartment: Checking and cleaning the convection tube naturally; Checking and cleaning frames, drawers, and heating compartments; check and clean the aluminum radiator; check the heating system; cleaning the working compartment and wheels, brackets ...; Hygiene of thermal cavity, dispersed fan. - Maintenance behind the device: cleaning the surface of the device's back - Maintenance outside the device: Cleaning around the device, cleaning the display screen; Clean the device's installation system. - Check the temperature after maintenance - Temperature accuracy
As above
50
JSGI warm cabinet 153 p
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance above the device: cleaning on the lid or lid above the device; - Maintenance inside the working compartment: Checking and sanitation maintenance inside the working compartment: Checking and cleaning the convection tube naturally; Checking and cleaning frames, drawers, and heating compartments; check and clean the aluminum radiator; check the heating system; cleaning the working compartment and wheels, brackets ...; Hygiene of thermal cavity, dispersed fan. - Maintenance behind the device: cleaning the surface of the device's back - Maintenance outside the device: Cleaning around the device, cleaning the display screen; Clean the device's installation system. - Check the temperature after maintenance - Temperature accuracy
As above
51
JSGI 100P warm cabinet
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance above the device: cleaning on the lid or lid above the device; - Maintenance inside the working compartment: Checking and sanitation maintenance inside the working compartment: Checking and cleaning the convection tube naturally; Checking and cleaning frames, drawers, and heating compartments; check and clean the aluminum radiator; check the heating system; cleaning the working compartment and wheels, brackets ...; Hygiene of thermal cavity, dispersed fan. - Maintenance behind the device: cleaning the surface of the device's back - Maintenance outside the device: Cleaning around the device, cleaning the display screen; Clean the device's installation system. - Check the temperature after maintenance - Temperature accuracy
As above
52
Refrigerator 130 liters
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance above the device: cleaning on the lid or lid above the device; Maintenance inside the working compartment: Checking and cleaning the natural convection tube; Checking and cleaning frames, drawers, and heating compartments; checking anticoagulant and anti -freezing systems; Check and clean the protective sensor; test heating system; check and clean the heating system; Cleaning the working compartment and wheels, racks ...; check and clean the lighting system; Check the equipment installation system. - Maintenance behind the device: cleaning the surface of the device; Cleaning the device cooling system (fan, heat sink ...); Clean the wastewater discharge system. - Maintenance outside the device: Cleaning around the device, - Check the temperature after maintenance - Temperature accuracy
As above
53
314 liters
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance above the device: cleaning on the lid or lid above the device; Maintenance inside the working compartment: Checking and cleaning the natural convection tube; Checking and cleaning frames, drawers, and heating compartments; checking anticoagulant and anti -freezing systems; Check and clean the protective sensor; test heating system; check and clean the heating system; Cleaning the working compartment and wheels, racks ...; check and clean the lighting system; Check the equipment installation system. - Maintenance behind the device: cleaning the surface of the device; Cleaning the device cooling system (fan, heat sink ...); Clean the wastewater discharge system. - Maintenance outside the device: Cleaning around the device, - Check the temperature after maintenance - Temperature accuracy
As above
54
Level II biosafety cabinets
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the conformity with technical requirements of parts, shapes, models ...; check equipment information, instructions for full and clear use; Checking the source structure to connect equipment to the appropriate source, turning on the power, checking the operation structure of the device, the key, the connection ports; Check the operating status of motor, sensors; Assessment of equipment status. - External maintenance: Cleaning the surface around the device (above, below, on the side and behind the device), the equipment area; Examining exterior, condition and hygiene, the price has connected ports; Check out the appearance, status and clean the keyboard, display screen - Maintenance of the area above the cabinet: Checking, hygiene and protection, door adjustment door and output; Check the hygiene to reinforce power ports connecting the power to the motor, the motorbike booting, the motor regulating system; check and clean the filter plate, extra appendage; Check, sanit Sensor wind speed. - Inner maintenance: Checking and hygiene of wind circulation; check and clean the surface of HEPA filters; Cable check, Motor hygiene. - Maintenance of working area: Checking, cleaning the protection mesh and the surface of HEPA filters; check and clean the lighting system, UV (light bulbs, tanfo, electrical connections, switches ...); Check, hygiene around the working compartment and door frame, safety, switch sensor. - Maintenance of the area below: Check and clean the rough filter; Check and clean power source connections to motor, motor starting parts, wind sensor, speed ...; check and clean the safety parts (shields, mesh); Checking, cleaning the wind cavity, exhaust blades ... - Maintenance of the rear area: Checking, hygiene of connections, counterpart motor hygiene, counterweight panels; Check and clean the sheet behind the device, the poly. - Maintenance of control systems: Checking, hygiene of source, control of connections; check, clean the controller, wind speed; Check, give birth to the keyboard, the connection.
As above
55
HB Incourse Cabinet
1
Female
Maintenance and maintenance: Pre -maintenance test: Check the conformity with technical requirements of parts, shapes, models ...; check equipment information, instructions for full and clear use; Checking the source structure to connect equipment to the appropriate source, turning on the power, checking the operation structure of the device, the key, the connection ports; Check the operating status of motor, sensors; Assessment of equipment status. - External maintenance: Cleaning the surface around the device (above, below, on the side and behind the device), the equipment area; Examining exterior, condition and hygiene, the price has connected ports; - Maintenance of the area above the cabinet: Checking, hygiene and protection, door adjustment door and output; Check the hygiene to reinforce power ports connecting the power to the motor, the motorbike booting, the motor regulating system; check and clean the filter plate, extra appendage; Check, sanit Sensor wind speed. - Inner maintenance: Checking and hygiene of wind circulation; check and clean the surface of HEPA filters; Check cleaning motor, rotor, suction cage; Cable check, Motor hygiene. - Maintenance of working area: Checking, cleaning the protection mesh and the surface of HEPA filters; check and clean the lighting system, UV (light bulbs, tanfo, electrical connections, switches ...); Check, hygiene around the working compartment and door frame, safety, switch sensor. - Maintenance of the area below: Check and clean the rough filter; Check and clean power source connections to motor, motor starting parts, wind sensor, speed .... - Maintenance of the rear area: Checking, hygiene of connections, counterpart motor hygiene, counterweight panels; Check and clean the sheet behind the device, the poly. - Maintenance of the control system: Checking and cleaning the keyboard, the connections. Check after maintenance: Check noise; check the wind speed through the door; check the wind speed down the working compartment surface; light illuminance down to the working surface (background light) (Lux); testing anti -anti -anti -anti -antibodies at the working surface, LUX; testing of filters, %; Test purple light intensity.
As above
56
Metrohm 827 pH
1
Female
Maintenance, maintenance: Pre -maintenance test: Equipment information - Inner and external maintenance: hygiene around the device; check and clean the connection ports; Clean the keyboard, exam screen, battery sliding tray; Checking connection wire hygiene; Check, clean the main motherboard and control bo. - Sensor maintenance: Examination and hygiene of electrode; Add electrolytic solution; Check and clean the temperature probe. - Check accuracy - Check electrode performance
As above
57
IR turbine meter 1000
1
Female
Maintenance, maintenance: Pre -maintenance test: Equipment information - Inner and external maintenance: hygiene around the device; check and clean the connection ports; Clean the keyboard, exam screen, battery sliding tray; Checking connection wire hygiene; Check, clean the main motherboard and control bo.
As above
58
UDK 132 and DK6 semi -automatic protein machine
1
Female
Maintenance and maintenance: Pre -maintenance test: Selftest mode "pass" system; Check the feedback of the control set (buttons, touch, knob); Warning display (LCD screen, LED light, Buzz ...); check the functions of the system (pump, heating, rotary motor, lifting axis ...); check the functions of the system (heating, probes ...); Check software activities, device warning functions. - Maintenance of working areas: Checking and hygiene around the device; checking hygiene of source ports, external auxiliary equipment; Check the key to the key, the display screen; Clean the display area; Cleaning racks, inspiration trays; Check and clean the steam and pipes of the sample; Check and hygiene Roang high steam tube. - Maintenance inside the device: Checking and sanitizing cooling water pipes, input water, water supply to the tank, shot pipes, titration chemicals; Check the skin of the source switch; check and clean the keyboard board and display screen; Hygiene of vapors. - Check post -cell postparts
As above
59
Polarized (0-100%)
1
Female
Maintenance, maintenance: External inspection: Equipment information, fully instructed - Technical test: installation system, display normal operation - Perform maintenance: hygiene outside the device, sanitizing the measuring compartment; Hygiene of light sources, cleaning the viewfinder; Tell the point not equal to the adjustment screw. - Measurement test: repeat level
As above
60
Germany Nabbertherm furnace
1
Female
Maintenance and nursing: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Cleaning outside the device: cleaning the protective plate, the upper heat holder; Check the roof cleaning or lid above the device; Check the display screen hygiene, Settings system; Clean the back of the device. - Hygiene of working compartments: hygiene of heating system; Cleaning the temperature probe; Clean the compartment - Check the temperature after maintenance: temperature accuracy; Operating characteristics.
As above
61
Sample stirrer T 180D
1
Female
Maintenance and maintenance: Power inspection: Using the power meter to check the power plug source, checking the grounding - Check and clean the entire body and shell: Use a clean towel and alcohol to clean the outer shell of the device, the power cord. - Check the sensitivity of the function keys. - Check the board of the machine, check the sample stirring speed.
As above
62
GFL1002-1013 thermal cashew tank
1
Female
Maintenance and maintenance: External inspection: Equipment information. - Technical inspection of heat system: Settings display system; The heating system is active. - Maintenance of heat compartments: Cleaning the working compartment; check the hygiene of thermal probes; Check hygiene of heating system. - Maintenance inside the device: Cleaning the inner compartment of the device. - Maintenance around the device: Cleaning, cleaning working surfaces and around the equipment surface; hygiene of drainage system; Screen hygiene and control system. - Check the temperature after maintenance: temperature accuracy; Operating characteristics.
As above
63
Electronic technical scales 2 numbers Sky 600t
1
Female
Maintenance, maintenance: Checking and cleaning the whole body, shell - Check the accuracy of the weight weight - Check the stability of the device
As above
64
Microscope 2 vision Pink MC 50 micros
1
Female
Maintenance, maintenance: Checking and cleaning the whole body, shell - Check the accuracy of the weight weight - Check the stability of the device - External inspection: Equipment information - Clean the entire surface of the glass, glass, glass objects with solutions and dedicated towels. - Check and clean the lighting system (lights, reflected mirrors).
As above
Other attachments

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Utilities for you
Follow quote requests
The Track Request for Quotation function helps you quickly and promptly receive email notifications of changes to Request for Quotation "Calibration, maintenance, equipment maintenance in 2025". Our software will track the requests for quotations that you have registered for you. When there is any change, it will immediately send you an email notification.
Receive similar quote requests via email
To be one of the first to receive similar Requests for Quotations by email: "Calibration, maintenance, equipment maintenance in 2025" as soon as they are published, subscribe to DauThau.info's VIP 8 package.
Views: 16

Select columns to display


You did not use the site, Click here to remain logged. Timeout: 60 second