Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Cost of collecting, assessing current status, classifying and classifying dikes |
1 |
Job |
Purpose: To make an overall assessment of the natural, economic, social conditions and factors affecting the dyke system of Ninh Binh province (former Ha Nam and Nam Dinh areas), it is necessary to collect relevant documents, in which information on population and protected area of the dykes is one of 03 important criteria to determine dyke level according to Circular 54/2013/TT-BNNPTNT, in addition to reviewing Consider adjusting the dike level to increase or decrease depending on the important nature of the protected area (cities, economic, cultural, industrial, defense, security zones, traffic hubs). Therefore, the basic types of documents that need to be collected include: - Collecting basic documents on natural conditions, topography, geology, meteorology, hydrology, and natural disasters caused by rain and storms; Current status and direction of socio-economic development including data on types of areas and population in the former Ha Nam and Nam Dinh provinces. - Collect documents on dike routes and management works (elevation, dike cross-section, body, dike foundation...), incidents related to dike routes that have appeared; Current regulations on water levels and design flood flow for each location. - Collect relevant maps and diagrams including: current status map of the dyke system, topographic map, flood map... - Field survey and work with localities where the dyke passes through and the dyke management districts to collect information about the flood situation, incidents that have occurred, and compare and contrast management data and the current status of the project. - Synthesize, analyze, evaluate documents and collected information: systematically synthesize all collected documents, classify by each field, topic, digitize and catalog for convenience when searching, analyzing, and evaluating. |
Ninh Binh province |
Prepared based on economic - technical norms issued with Circular No. 22/2022/TT-BNNPTNT dated December 29, 2022, amended with a number of articles in Circular 10/2026/TT-BNNMT dated February 6, 2026 of the Ministry of Agriculture and Environment. In which: - Work items are applied according to the norms in Table 2.1. Labor norms with the number of workers are as follows: + Collect documents, general survey: 44.8 workers in foreign industry + Analyze and evaluate the current state of dykes; Classifying and decentralizing dykes: 52.26 domestic industrial works + Making different types of diagrams: 48.38 domestic industrial works (applying a reduction factor of 0.5) - Equipment costs (Ctb) apply the norms in Table 2.2. Equipment norms - Instrument costs (Cdc) apply the norms in Table 2.3. Tool norms - Material costs (Cvl) apply the norms in Table 2.4. Material norms - Total coefficients for using materials, tools, machinery and equipment for internal work of 03 work items is: 0.16. - Look up according to Table 1.3. Table of adjustment coefficients according to the size of the planning area KF determines KF = 0.92 - Adjustment coefficients are found in Table 1.4. The table of adjustment coefficient K for the adjustment of dyke planning and flood prevention and control of rivers with dykes with a period of over 10 years determines K = 1.0 |
Additional detailed estimates attached |
|
2 |
Topographic survey costs: Highly controlled measurements. Technical standards. Terrain level II |
118 |
km |
Purpose: Determine the flood protection elevation and current geometric cross-section of the right Hong and left Day dykes (former Ha Nam area). Basic content includes: - Measuring and drawing the cross section, determining the width of the dike surface, dike body, and dike slope coefficient. The measured and drawn dike cross-section density is 5.0km/section. - Huu Hong dyke measures 9 MCN: total length of MCN of terrestrial dyke is 450m; Technical level standards along the 39km route; Technical standards close to the 15km mark. The bottom dyke measures 11 MCN: total length of MCN on land dyke is 440m; Technical level standards along the 49km route; Technical standards close to the 15km mark. |
Ninh Binh province |
Apply survey norms issued with Circular 11/2021/TT-BXD dated August 31, 2021 |
Additional detailed estimates attached |
|
3 |
Topographic survey costs: Measuring and drawing cross-sections on land. Terrain level II |
8,9 |
100m |
Purpose: Determine the flood protection elevation and current geometric cross-section of the right Hong and left Day dykes (former Ha Nam area). Basic content includes: - Measuring and drawing the cross section, determining the width of the dike surface, dike body, and dike slope coefficient. The measured and drawn dike cross-section density is 5.0km/section. - Huu Hong dyke measures 9 MCN: total length of MCN of terrestrial dyke is 450m; Technical level standards along the 39km route; Technical standards close to the 15km mark. The bottom dyke measures 11 MCN: total length of MCN on land dyke is 440m; Technical level standards along the 49km route; Technical standards close to the 15km mark. |
Ninh Binh province |
Apply survey norms issued with Circular 11/2021/TT-BXD dated August 31, 2021 |
Additional detailed estimates attached |
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor Chi cục Thủy lợi Ninh Bình:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding Chi cục Thủy lợi Ninh Bình:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.