| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Expert in installing and aligning coal crushers |
10 |
01 Task |
- Inspect the main crusher's axle and bearing: Check the surface of the axle (trunnion), assess the condition of the bearings to determine if they need to be removed for inspection.
- Inspect the large gear and pinion: Check the condition of the large gear and pinion, as well as the center distance and axial offset of the large gear, and provide adjustment specifications.
- Inspect within the crusher bin: Check the condition of the lining plates and bolts, conveyor screws, axle surface, and level sensors, and propose reinforcement measures.
- Inspect the gearbox and bevel gear: Check the condition of the gearbox bearings, backlash, and provide adjustment specifications.
- Inspect dust seals: Check the condition of the seals.
- Estimated inspection time: 10 shifts, with an 8-hour shift being considered one shift per day.
- Required personnel position: Pulverizer system installation and commissioning advisor (Erection and Commissioning Advisor for Pulverizer).
- Education level: Must have a diploma or higher in mechanical engineering, machine manufacturing, power generation, or a related field.
- Years of relevant professional experience: Minimum 10 years of specialized experience working with pulverizer systems.
- Experience with similar contracts/projects:
+ Previous experience as an installation and commissioning advisor (Erection/Commissioning Advisor) or a design and installation advisor (Designer and Installation Advisor) for pulverizer systems.
+ Successful completion of at least 03 projects/contracts involving the installation, maintenance, or commissioning of ball mills in coal-fired power plants with a capacity of 1 or more units from 300MW. |
Nghi Son 1 Thermal Power Plant – Km11, Route 513, Nghi Son Ward, Thanh Hoa Province |
From September 20, 2026, to October 9, 2026. |
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor NGHI SƠN THERMAL POWER COMPANY:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding NGHI SƠN THERMAL POWER COMPANY:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.