Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Submersible pump capacity 1.1 Kw (Air conditioner compartment)
- Maintenance check:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
2 |
Check signal buoy (Air conditioner compartment)
- Clean the float.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control buoy (If any) |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
3 |
Submersible pump capacity 1.1 Kw (Aerobic containment 01) - Check and maintain:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
4 |
Check the signal buoy (Aerobic compartment 01) - Clean the buoy.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control buoy (If any) |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
5 |
Submersible pump capacity 1.1 Kw (Aerobic compartment 02) - Check and maintain:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
6 |
Check the signal buoy (Aerobic compartment 02) - Clean the buoy.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control buoy (If any) |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
7 |
Submersible pump capacity 1.1 Kw (Aerobic compartment 03) - Check and maintain:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
8 |
Check the signal buoy (Aerobic compartment 03) - Clean the buoy.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control buoy (If any) |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
9 |
Submersible pump capacity 1.1 Kw (Intermediate compartment 05) - Check and maintain:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
10 |
Check the signal buoy (Intermediate compartment 05) - Clean the buoy.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control buoy (If any) |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
11 |
Submersible pump capacity 1.1 Kw (Settlement compartment 06) - Check and maintain:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
12 |
Check the signal buoy (Settlement compartment 06) - Clean the buoy.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control electric float (If any) Check the operation of the pipeline system, valve connected to the pump - Check and replace the impeller at the bottom of the pump. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
13 |
Submersible pump capacity 1.1 Kw (Disinfection and discharge compartment 07) - Maintenance check:
- Check voltage
- Check the operation of the pump, the operation of the level indicator, check for garbage blockage...
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the operation of the pipeline system and valve connected to the pump
- Check and replace pump bottom impeller.
- Check the tightness of pumps, 1-way valves, lever valves, and material wear properties
- Clean the pump and check the pump's tightness.
- Connect the terminal box for pump control wire and float control wire. |
2 |
Female |
- Check maintenance: - Check voltage - Check operation of pump, operation of level indicator, check for garbage blockage... - Check noise, temperature, conductivity, insulation, pressure drop - Check operation of pipe system, valve connected to pump - Check and replace pump bottom impeller. - Check the tightness of the pump, 1-way valve, lever valve, material wear feature - Clean the pump and check the tightness of the pump. - Connect the terminal box for pump control wire and float control wire. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
14 |
Check the signal buoy (Disinfection and discharge compartment 07) - Clean the buoy.
- Check the condition of the float.
- Check the float switch contact.
- Check the electrical connection position of the electric float in the tank.
- Make sure to cover the buoy tightly.
- Replace the control buoy (If any) |
1 |
Female |
- Clean the float. - Check the condition of the float. - Check the float switch contact. - Check the electrical connection position of the electric float in the tank. - Make sure to cover the buoy tightly. - Replace the control buoy (If any) |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
15 |
Air blower (Control system) - Check the valves and safety valves of the air blower, lubricate the valve ecubulong.
- Clean the air filter of the air blower.
- Replace engine oil and grease at rusted areas.
- Replace the belt
- Clean the suction silencer tube
- Check the voltage, noise level, and amount of air blown into the aerobic tank
- Check the electrical power of the motor, inverter, and interrupting devices
- Check the operation of the pipe system and valve connected to the air blower.
- Replace bearings and engine oils inside the engine. |
2 |
Female |
- Check the valves and safety valves of the air blower, lubricate the valve ecubulong. - Clean the air filter of the air blower. - Replace engine oil and grease at rusted areas. - Replace the belt - Clean the suction silencer pipe - Check the voltage, noise level, and amount of air blown into the aeration tank - Check the electrical power of the motor, inverter, shut-off devices - Check the operation of the pipe system, valve connected to the air blower. - Replace bearings and engine oils inside the engine. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
16 |
Dosing pump capacity: 45 w (Control system) Current situation is that there are 02 pumps, of which 1 is burned out and 1 is running weakly.
- Maintenance and repair of metering pumps.
- Check electrical connections
- Check the supply voltage to the pump and safety devices
- Check noise, temperature, conductivity, insulation, voltage drop
- Check the leakage and actual flow of the device.
- Clean equipment.
- Maintain and repair old pumps as backup pumps. |
2 |
Female |
The current situation is that there are 02 pumps, of which 1 is burned out and 1 is running weakly. - Maintenance and repair of metering pumps. - Check electrical connections - Check the voltage supplied to the pump and safety devices - Check noise, temperature, conductivity, insulation, voltage drop - Check leakage and actual flow of the device. - Clean equipment. - Maintain and repair old pumps as backup pumps. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
17 |
Fixing the trash basket (Control system) - Current situation: 02 trash baskets at the position lacking air have come loose, the mesh layer of the trash basket is small leading to blockage at this location.
- Adding larger trash screens to create ventilation for the water lines of the drainage compartments.
- Clean the surrounding areas and trash trap locations. |
1 |
HT |
- Current situation: 02 garbage baskets at the position lacking air have come loose, the mesh layer of the garbage basket is small leading to blockage at this location. - Adding larger trash screens to create ventilation for the water lines of the drainage compartments. - Clean the surrounding areas and trash trap locations. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
18 |
Supply chemicals and calibrate the system, (Control system) - Instruct operators to check the following criteria:
+ At the conditioning tank, water color, wastewater smell, air bubbles, aeration at the bottom of the tank.
+ Anoxic tank: measure DO, PH, mud color, and changes in mud color.
+ Aerobic tank: Check Do, PH, Air bubbles, sludge color, sludge flocculation ability, measure SV30.
+ Sedimentation tank: Check the settling time of the equipment, biological sludge process at the sedimentation tank location.
+ Test samples and evaluate water quality.
- write operational reports
- Provide chemicals for the entire system for test operation |
1 |
Package |
- Instruct operators to check the following indicators: + At the conditioning tank, water color, wastewater odor, air bubbles, aeration at the bottom of the tank. + Anoxic tank: measure DO, PH, mud color, and changes in mud color. + Aerobic tank: Check Do, PH, Air bubbles, sludge color, sludge flocculation ability, measure SV30. + Sedimentation tank: Check the settling time of the equipment, biological sludge process at the sedimentation tank location. + Test samples and evaluate water quality. - Write operation reports - Provide chemicals for the entire system for test operation |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
|||
19 |
Test certificate (Control system) - After running the water sample successfully, the contractor will take water samples to check the water quality according to output standards. |
1 |
time |
- After running the water sample, the contractor will take water samples to check the water quality according to output standards. |
Doi Can Street, Doi Can TDP, Vinh Tuong commune, Phu Tho province |
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor TRUNG TÂM Y TẾ KHU VỰC VĨNH TƯỜNG:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding TRUNG TÂM Y TẾ KHU VỰC VĨNH TƯỜNG:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.