We request that you provide a quotation for goods and materials required to implement the project "Improving Lives Through Positive Physical and Mental Health Transformation in Lao Cai Province, Phase 2 (2026-2028)," which is funded by Samaritan's Purse/USA.

Find: 16:42 10/08/2026

Bid info

Project name/purchase estimate
The "Improving Lives Through Positive Physical and Mental Health Transformation in Lao Cai Province, Phase 2 (2026-2028)" project is funded by Samaritan's Purse/USA.
Bid name

Basic information of the request for quotation

Request for quotation code
RQ2600032508-00
Status
Posted
Name of request for quotation
We request that you provide a quotation for goods and materials required to implement the project "Improving Lives Through Positive Physical and Mental Health Transformation in Lao Cai Province, Phase 2 (2026-2028)," which is funded by Samaritan's Purse/USA.
Address of the unit requesting a quote
Address of the unit requesting a quote (After merge)
House A, Building 3, Phường Cam Đường, Province Lào Cai
Categorize quotation requests
Other goods and services bidding packages

Contact information of the person responsible for receiving the quotation

Full Name
Lưu Thị Kim Tuyến
Position
Specialist
Phone number
Address
Dong Tam 1 Village, Yen Bai Ward, Lao Cai Province

How to receive quotation

Form of receiving quotation
Offline
Location of request for quotation
http://muasamcong.mpi.gov.vn
Quotation acceptance time
Since 10/08/2026 16:42 To date 19/08/2026 16:30
Validity period of quotation
60 Day kể từ ngày 19/08/2026 16:30
Request for quotation
 

Content of request for quotation

Filter data

data/page
No List of product/services Quantity Unit Description Location Specification Note Feature
1
Two-hole hollow brick, size A1
92.000
Tablet
Two-hole hollow brick, size A1
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
2
1x2 cm gravel (suitable for creating self-draining channels)
60
m3
1x2 cm gravel (suitable for creating self-draining channels)
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
3
Sand for concrete (Concrete sand)
28
m3
Sand for concrete (Concrete sand)
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
4
30x30 cm ceramic anti-slip floor tiles
120
M2
30x30 cm ceramic anti-slip floor tiles
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
5
White ceramic wall tile, size 30x45 cm
360
M2
White ceramic wall tile, size 30x45 cm
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
6
Sand for construction
44
m3
Sand for construction
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
7
Sandcastle
40
m3
Sandcastle
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
8
PC30 Cement
30.000
Kg
PC30 Cement
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
9
1-ounce steel cable
40
Kg
1-ounce steel cable
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
10
Steel, diameter 10
2.287,6
Kg
Steel, diameter 10
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
11
Steel, D14
1.355,2
Kg
Steel, D14
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
12
D6 steel
224
Kg
D6 steel
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
13
D76 PVC pipe
80
M
D76 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
14
90mm diameter PVC pipe
400
M
90mm diameter PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
15
Stainless steel floor drain funnel, size D76
40
Female
Stainless steel floor drain funnel, size D76
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
16
90mm diameter PVC pipe
240
Female
90mm diameter PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
17
PVC plastic numbing D90
40
Female
PVC plastic numbing D90
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
18
76mm diameter PVC pipe
80
Female
76mm diameter PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
19
D48 C2 PVC pipe
80
M
D48 C2 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
20
Collapse
40
Female
Collapse
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
21
Self-adhesive PE plastic film, 1 cubic meter
40
Female
Self-adhesive PE plastic film, 1 cubic meter
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
22
700L Stainless Steel Water Tank
40
Female
700L Stainless Steel Water Tank
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
23
PVC pipe end cap, size D90
80
Female
PVC pipe end cap, size D90
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
24
15mm diameter metal flood prevention valve (made of brass)
40
Female
15mm diameter metal flood prevention valve (made of brass)
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
25
D34 C2 PVC pipe
80
M
D34 C2 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
26
15mm diameter plastic faucet
80
Female
15mm diameter plastic faucet
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
27
D27 PVC plastic pipe
40
Female
D27 PVC plastic pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
28
D48 PVC plastic sheet
40
Female
D48 PVC plastic sheet
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
29
D27 C2 PVC pipe
120
M
D27 C2 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
30
Reinforcement outside of PVC D48
40
Female
Reinforcement outside of PVC D48
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
31
Ren for use with D27 PVC pipe
40
Female
Ren for use with D27 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
32
PVC plastic pipe, 48mm diameter x 27mm length
40
Female
PVC plastic pipe, 48mm diameter x 27mm length
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
33
D48 PVC pipe
80
Female
D48 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
34
PVC plastic cap, size 48mm x 34mm
40
Female
PVC plastic cap, size 48mm x 34mm
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
35
PVC plastic stake, 34mm x 34mm
40
Female
PVC plastic stake, 34mm x 34mm
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
36
PVC plastic bottle, size 34x27
40
Female
PVC plastic bottle, size 34x27
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
37
PVC plastic bottle, size 34x27
80
Female
PVC plastic bottle, size 34x27
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
38
D27 PVC pipe
120
Female
D27 PVC pipe
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
39
Straight-thread internal PVC fitting, D27 x 1/2"
120
Female
Straight-thread internal PVC fitting, D27 x 1/2"
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
40
Tan
40
district
Tan
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
41
PVC adhesive
40
Tube
PVC adhesive
Villages of Ta Ghenh and Mu That, Phong Ho commune, Lao Cai province
Other attachments

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Approval decision information
Approval decision file

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Utilities for you
Follow quote requests
The Track Request for Quotation function helps you quickly and promptly receive email notifications of changes to Request for Quotation "We request that you provide a quotation for goods and materials required to implement the project "Improving Lives Through Positive Physical and Mental Health Transformation in Lao Cai Province, Phase 2 (2026-2028)," which is funded by Samaritan's Purse/USA.". Our software will track the requests for quotations that you have registered for you. When there is any change, it will immediately send you an email notification.
Receive similar quote requests via email
To be one of the first to receive similar Requests for Quotations by email: "We request that you provide a quotation for goods and materials required to implement the project "Improving Lives Through Positive Physical and Mental Health Transformation in Lao Cai Province, Phase 2 (2026-2028)," which is funded by Samaritan's Purse/USA." as soon as they are published, subscribe to DauThau.info's VIP 8 package.
Views: 2

Select columns to display


You did not use the site, Click here to remain logged. Timeout: 60 second