Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn5801194042 | 5801194042 |
CÔNG TY TNHH ĐỨC VĨNH THÀNH |
479.000.000 VND | 479.000.000 VND | 20 day |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn0312718780 | 0312718780 | DAI PHU INDUSTRIAL ELECTRICAL EQUIPMENT MATERIALS COMPANY LIMITED | "Criteria 1.A; 2.B and 5.A of the contractor do not respond" + (1.A) The contractor has no drawings on the construction plan for each main job item of the bidding package. Proposing unreasonable construction plans (nose 1- Set of construction 1- Cultural and sports house, 03 sets of lights (implementation progress- installation+ check) 4 days, but in section 6, suitable for the proposed schedule, the nose 1: Completed in the first 5 days)); 2. Plan for organizing construction nose: 4 days (tip No. 1); The construction manpower for the first 5 days of all 5 doses in the explanation is (20 people = 5+8+7), in the progress table is 29 people. +(2.b) Construction manpower in the first 5 days of all 5 doses in the explanation is (20 people = 5+8+7), in the progress table is 29 people. The layout of the mixer and compactor is unreasonable (the construction time sheet is from 3-xy 7th but the schedule is from 3 to 17) + (5.A) The contractor has no warranty proposal "For equipment that manufacturers or suppliers ... have regulations on the warranty period, the warranty period for such equipment must be as minimal as the warranty period of the manufacturer, supplier" |