Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn4600779096 |
HTX công nghiệp và xây dựng Long Thành |
3.518.893.990 VND | 3.518.893.990 VND | 210 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn4601122433 | VIET ALPHA JOINT STOCK COMPANY | - At Section 2.2. Overall construction solutions of bidding packages: At the file "Overall construction solution" Section IV. Embankments 2 heads: Contractor explanation "Demolition of stone structure built with an excavator mounted with hydraulic hammer combined manual" is not suitable for the current status of the project when opaque stone walls existing to open water from the vertical groove with KT60X40X100. - In section 2.3. Explain technical measures to execute the items: + Voiceover contractor using Terrazzo KT30x30x4 tiles is not suitable for design documents, bidding documents (requirements Terrazzo bricks have KT40x40x3). + Contractors do not explain measures to build and take care of trees. - In Section 4.3. Construction schedule: * For construction schedule: + The contractor arranges the construction of embankments from May 23 to May 29, while the work of training and building embankment walls is carried out from June 12 to July 6, which is not suitable for the design documents as well as actual construction outside the scene. + The contractor shows the construction of plants and construction of reinforced concrete hats (reinforced concrete) after finishing the sidewalk is not suitable for the construction method proposed by the contractor. Specifically, in the file "Terrazzo tiled", the contractor explained "construction of Terazo tiled tiles after the construction of the sidewalk sidewalk, water collection doors, bundle of tree tubes, drainage ditches ...". However, according to the current schedule, the contractor arranged construction of trees and reinforced hats after paving the sidewalk. * For device mobilization charts: + Contractors do not mobilize "self -pouring cars" to serve the work of excavating summer structure from August 31 to 9 September is not suitable for the construction measures proposed by the contractor at the file "Digging soil". + The contractor does not mobilize the "excavator" to perform the work of digging the stump after cutting the trees is not suitable for the construction method proposed by the contractor at the file "cutting trees". + Contractors do not mobilize "concrete mixers" to serve the construction of bundles from September 20 to October 9 and construction of abutments and knitting plates from November 9 |