Civil Works

        Watching
Tender ID
Views
14
Contractor selection plan ID
Bidding package name
Civil Works
Bidding method
Online bidding
Tender value
3.960.410.000 VND
Publication date
09:33 11/07/2025
Contract Type
All in One
Domestic/ International
Domestic
Contractor Selection Method
Single Stage Single Envelope
Fields
Constructions
Approval ID
342/QĐ-BĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
Binh Dien Quang Tri Joint Stock Company
Approval date
11/07/2025
Tendering result
There is a winning contractor
List of successful bidders
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Bid price Technical score Winning price Delivery time (days) Contract date
1 vn0400530594

CÔNG TY TRÁCH NHIỆM HỮU HẠN PHƯỚC HẢI

3.679.352.026,86 VND 3.679.352.000 VND 120 day
List of unsuccessful bidders:
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Reason for failure
1 vn3200677482 KAPAL JOINT STOCK COMPANY + The contractor does not participate in the scene survey under the E-CDNT 7.6 Chapter II, the contractor directs the contractor to organize the proper construction measure: Lead the contractor to arrange the construction ground is not appropriate: - The overall ground arranges the ground area to build a camp coincidence into the location of the factory's production area (at the general hospital, the site is arranged) - The drawing of the camp layer is not consistent with the explanation of section I. Organizing the specific construction ground: the contractor has not yet arranged "waste gathering yard" that does not meet the requirements of E-HSMT + Detailed construction solutions: The contractor applies the following specific standards and standards: -Applying TCVN 5574-2012 has expired now replaced TCVN 5574-2018 designed concrete structure and reinforced concrete structure - Application of QCVN 18: 2014/BXD National technical regulation on safety in construction has expired now replaced QCVN 18: 2021/BXD according to E-HSMT technical instructions - Applying TCVN 8256: 2009 has expired now replaced TCVN 8256: 2022 plasterboard - Technical requirements - Concrete work applied TCVN 3105: 1993 has expired now replaced TCVN 3105: 2022 + Unreasonable construction progress: The starting date of construction 3/5/2025 and ending 1/9/2025 (according to the notice of bidding invitation IB2500266233 posted on 12/6/2025); + Measures to ensure the quality of input raw materials to serve the construction work: Contractors apply the standard to expire; - TCVN 141: 2008 has expired now replaced TCVN 141: 2023 - TCVN 4030: 2003 has expired now replaced TCVN 13605: 2023
2 vn3200484508 TINH NHU PHAT COMPANY LIMITED + For the main materials and equipment put into the project: - Principle contracts and commitments to the main material included in Document No. 05/CKVL/BDTP dated June 19, 2025, which is not consistent with the II part of the Group "Commitment to supplying main materials and sources" does not agree on the type of supplies put into the project. * Deviation content between commitment minutes No. 05/CKVL/BDTP dated June 19, 2025 specifically: - Cement using Gianh River, Bim Son Phuong Loan Quang Tri One Member Limited Company provides wrong with the table "Commitment to supply main materials and supply" Kim Dinh Cement has not been determined by the supply unit. - Sand of all kinds supplied from the collection of Trieu Ai, Trieu Phong district, provided by Tan Loc Phat Trading Co., Ltd. is different from the table "Commitment to supply main materials and supply" sand of sources taken at An Lo beach and identify the supplier. - Stone of all kinds of colored heads by Tan Loc Phat Trading Co., Ltd. is different from the table "Commitment to supply main materials and supply" stone sources of all kinds of sources taken by Thien Tan Joint Stock Company - Construction steel of all types of Hoa Phat steel using Phuong Loan Quang Tri One Member Limited Company provides wrong with the table "Commitment to supply main materials and supply" steel D10, D16, D18 using Vietnamese American steel has not yet determined the supply unit. - Unburnt bricks, baked bricks of all kinds provided by Minh Hung Tri Joint Stock Company is different from the table "Commitment to supply main materials and supply" solid bricks, 6 -hole bricks for Thien Tan Joint Stock Company - Tiles of all kinds using Vigracera provided by Hung Thuong Cuong Co., Ltd. differ different from the table "Commitment to supply main materials and supplies" using unknown Dong Tam bricks - Primeder, inside and outside the house using Joton painted by Joton Joint Stock Company, authorized to authorize the agent differently from the table "Commitment to supplying main materials and supplies" Use Kapal paint has not been identified by the supplier. - Xingfa doors, glass walls, sliding doors
You did not use the site, Click here to remain logged. Timeout: 60 second