Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn0301414501 | 0301414501 |
LUU NGUYEN CONSTRUCTION CO.,LTD |
65.354.298.899,155 VND | 65.354.298.899 VND | 300 day |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn0104895563 | 0104895563 | 319 SOUTHERN INVESTMENT CONSTRUCTION JOINT STOCK COMPANY | Regarding validity: Nhà thầu không kèm bảo đảm dự thầu (Theo Quy định tại Mục 18 – Chương I – E-HSMT), chỉ kèm Văn bản sửa đổi bảo lãnh dự thầu số Lần 1 ngày 18/02/2025 của Ngân hàng Thương mại Cổ phần Quân Đội (MB) – Chi nhánh Thành phố Hồ Chí Minh. | |
| 2 | vn0308976612 | 0308976612 | NGUYEN HOANG CONSTRUCTION INVESTMENT CORPORATION | a. About personnel: - Commander: Graduated from University of Construction (University Degree issued by Ho Chi Minh City University of Architecture on October 10, 1998) is not in accordance with civil construction at the request of E-HSMT; - Officers in charge of technical construction of water supply and drainage: Urban engineering engineer (university degree issued by Ho Chi Minh City University of Architecture on August 26, 2013) is not in accordance with the water supply and drainage field at the request of E-HSMT. b. About construction equipment: - The contractor proposes a number of construction equipment, but it is not fully accompanied by the documents proving at the request of E-HSMT, specifically: + Watering cars (with a capacity of ≥ 05m3); + Steel cake roller ≥ 16 tons; + Tire wheel machine ≥ 25 tons; + Scraping machine peeling the road surface; + Asphalt sprayer; + Plastic concrete spreading machines; + Stone brick cutting machine; + Welding machine. -Through the review, the contractor provided documents but did not meet E-HSMT, so the bid solicitor sent to Official Letter No. 385/DDCN-KHĐT dated February 28, 2025 on clarifying E-HSDT through the national bidding network, but the deadline for clarification of March 5, 2025 that the contractor did not answer clarified. After the assessment, the contractor's E-HSDT does not meet the requirements of E-HSMT. |