Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn1300571817 |
HOA THANG CONSTRUCTION COMPANY LIMITED |
250.568.144 VND | 250.568.144 VND | 30 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn1300577537 | CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC THỊNH | Phuc Thinh One Member Company Limited: a) The level of meeting technical requirements of construction materials: - Table of materials that do not meet the requirements at Chapter V of E-HSMT, specifically does not meet the following contents: + Documents citing in accordance with current standards; + Technical indicators. b) Technical solutions: - Organizational system: Explanation is not consistent with the diagram proposed by the contractor, responsibilities and duties among unclear parts. c) Quality assurance measures: - Quality management measures for each main construction work is not suitable according to current regulations, specifically: + Contractors using many regulations have expired such as: TCVN 5592: 1991; TCVN 3106: 1993; TCVN 5540: 1991; TCVN 3119: 1993; 20TCN171: 1989; TCVN 6285: 1997; TCVN 6286: 1997; TCXDVN 267: 2002. d) Labor safety, fire protection, environmental sanitation: - Labor safety: + Contractors have not yet identified dangerous areas, hazardous areas on construction sites and surrounding areas as required (only providing control solutions); + Using the valid regulations: TCVN 4086: 1985; 3147: 1990; TCVN 2622: 1978. | |
| 2 | vn1301093296 | CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI LINH KHÔI | Linh Khoi Trading Investment Company Limited: a) Quality assurance measures: - Measures to manage the quality of input materials: The contractor does not show the measure to prepare a record of quality management of materials, products, components and equipment used for the project. - The contractor does not explain the solution of the necessary documents to submit to the investor approval and approval before construction. - Measures to manage documents, records, completed drawings, acceptance, inadequate settlement and content that does not meet the requirements. b) Labor safety, fire prevention, environmental sanitation: - Labor safety: + Contractors have identified dangerous areas, hazardous areas on construction sites and surrounding areas as required but has not yet set up control measures to ensure safety. - Fire and explosion prevention measures: Fire and explosion prevention measures are not in compliance with current regulations. | |
| 3 | vn1201666560 | CÔNG TY TNHH XÂY DỰNG TÍNH NHÂN | CONSTRUCTION CO., LTD: a) The level of meeting technical requirements of construction materials: - Table of materials that do not meet the requirements at Chapter V of E-HSMT, specifically does not meet the following contents: + Documents citing in accordance with current standards; + Technical indicators; + The contractor proposes a AZ50 -colored cold tole, 0.42mm thick, 1.07m is not suitable according to the approved design (0.45mm cold tole). b) Quality assurance measures: - Measures to manage the quality of input materials: The contractor does not show the measure to prepare a record of quality management of materials, products, components and equipment used for the project. - The contractor does not explain measures to prepare necessary documents to submit to the investor approval and approval before construction. - Quality management measures for each main construction work is incomplete content at the request of E-HSMT. - Measures to manage documents, records, completed drawings, acceptance, inadequate settlement and content that does not meet the requirements. c) Labor safety, fire prevention, environmental sanitation: - Labor safety: + Do not identify dangerous areas, hazardous areas on construction sites and surrounding site areas, set up control measures to ensure safety as required. - Fire and explosion prevention measures: + Fire and explosion prevention measures are not conformed to the current regulations;-- + Using the valid regulations: TCVN 7278-1: 2003; TCVN 3890 - 2009. - Environmental sanitation: + Do not present the responsibilities of construction contractors on environmental protection in construction. |