Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0313111967 |
CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG NGHIỆP PHÁT |
10.739.190.011 VND | 10.739.000.000 VND | 180 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn1800738824 | TRUONG PHAT CONSTRUCTION CONSULTANCY COMPANY LIMITED | The contractor does not meet Point 1.1, Clause 1, Section 1; Point 3.2 Clause 3 Section 3 Chapter III E-Bidding evaluation standards, as follows: + The construction site layout drawing is unreasonable and not feasible for the bidding package. Specifically: The contractor has a layout drawing showing the command board, farms, warehouses, but does not show any location on the bidding package → Does not determine where to arrange in the bidding package → unreasonable, impossible (E-HSMT requires the contractor to self-survey to arrange suitable premises). + The construction schedule does not match the technical proposal. Specifically: In the technical proposal, the contractor proposed to construct the preparation & leveling items: 20 days; Electrical and lighting items: 25 days; Trees and equipment items: 15 days → In the progress table for the leveling items is: from 96 to 108 days; Electrical lighting category: from 90 to 96 days; Trees and equipment items: from 100 to 120 days → Not in accordance with the technical proposal. |