Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0301446479 | Liên danh Công ty SACD và Công ty SAFICO |
CÔNG TY TNHH KHẢO SÁT THIẾT KẾ TƯ VẤN SÀI GÒN |
612.000.000 VND | 90.6 | 612.000.000 VND | 30 day | |
| 2 | vn0316927136 | Liên danh Công ty SACD và Công ty SAFICO |
Safico Prevent And Fight Fire Safety Technical Co.,LTD |
612.000.000 VND | 90.6 | 612.000.000 VND | 30 day |
| # | Contractor's name | Role |
|---|---|---|
| 1 | CÔNG TY TNHH KHẢO SÁT THIẾT KẾ TƯ VẤN SÀI GÒN | main consortium |
| 2 | Safico Prevent And Fight Fire Safety Technical Co.,LTD | sub-partnership |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn1201470448 | Liên danh Nguyễn Khánh - Mekong | MEKONG TIEN GIANG TECHNOLOGY CONSULTANCY COMPANY LIMITED | - In the content of the solution and methodology evaluation: the contractor reaches 1.6 points <3.2 points (the minimum score required by Section 3.5- E-HSMT - In the content of personnel evaluation: the contractor reaches 36 points <40 points (the minimum required point level required in Section 2 Chapter III- E-HSMT) The total contractor score is 78.1 <80 points (the minimum score as required by E-HSMT) should not meet the technical requirements. |
| 2 | vn5800000255 | LAM DONG CONSTRUCTION CONSULTING JOINT STOCK COMPANY | - - In the content of evaluation of solutions and methodology: The contractor reaches 1.6 points <3.2 points (the minimum score as required by Section 3.5 - E -HSMT) - In the content of personnel evaluation: the contractor reaches 36.8 points <40 points (the minimum required point level required in Section 2 Chapter III- E-HSMT) The total contractor score is 75.2 <80 points (the minimum score as required by E-HSMT) should not meet the technical requirements. | |
| 3 | vn1801159298 | Liên danh Nguyễn Khánh - Mekong | NGUYEN KHANH COMPANY LIMITED | - In the content of the solution and methodology evaluation: the contractor reaches 1.6 points <3.2 points (the minimum score required by Section 3.5- E-HSMT - In the content of personnel evaluation: the contractor reaches 36 points <40 points (the minimum required point level required in Section 2 Chapter III- E-HSMT) The total contractor score is 78.1 <80 points (the minimum score as required by E-HSMT) should not meet the technical requirements. |