Construction, static testing, ensuring traffic safety

        Watching
Tender ID
Views
3
Contractor selection plan ID
Bidding package name
Construction, static testing, ensuring traffic safety
Bidding method
Online bidding
Tender value
15.915.754.985 VND
Publication date
15:00 24/12/2025
Contract Type
All in One
Domestic/ International
Domestic
Contractor Selection Method
Single Stage Single Envelope
Fields
Constructions
Approval ID
983/QĐ-BQLDAKV4
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
Regional Construction Investment Project Management Board 4
Approval date
24/12/2025
Tendering result
There is a winning contractor
List of successful bidders
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Bid price Technical score Winning price Delivery time (days) Contract date
1 vn3801281372

CÔNG TY TNHH TRUNG NAM BÌNH PHƯỚC

15.755.176.402,02 VND 15.755.000.000 VND 180 day
List of unsuccessful bidders:
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Reason for failure
1 vn1200365722 Liên danh Nâng cấp, mở rộng Đường huyện 27 CÔNG TY TNHH XÂY DỰNG-THƯƠNG MẠI-DỊCH VỤ HỮU LỢI - The contractor's E-Bidding Document presents technical measures that do not meet the requirements of the E-Bidding Documents stated at Point 1.1.5, Clause 1.1. Technical solutions, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): + Specifically: The Contractor has presented the technical solution at Point 1.5 page 11 to Point 1.8 page 12 Clause 1 Section I. THE REASONABILITY AND FEASIBILITY OF TECHNICAL SOLUTIONS AND CONSTRUCTION ORGANIZATION MEASURES SUITABLE WITH THE PROPOSAL ON CONSTRUCTION PROGRESS attached to the file "7. TECHNICAL SOLUTIONS AND CONSTRUCTION PHASES FOR CONSTRUCTION PROGRESS". However, the technical solution is not complete according to the requirements for the volume of work description of E-HSMT, is unreasonable, and does not follow the correct construction sequence. Therefore, the Expert Group unanimously agreed to evaluate this content as unsatisfactory.
2 vn1200674495 CÔNG TY TRÁCH NHIỆM HỮU HẠN THƯƠNG MẠI-DỊCH VỤ-XÂY DỰNG PHƯỚC HÙNG 1. The contractor's E-Bidding Documents presents technical measures that do not meet the requirements of the E-Bidding Documents stated at Point 1.1.5, Clause 1.1. Technical solutions, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): The contractor presented technical solutions for the construction work items of the project. However, the technical solution is not complete according to the requirements for the volume of work description of E-HSMT, is unreasonable, and does not follow the correct construction sequence. Therefore, the Expert Group unanimously agreed to evaluate this content as unsatisfactory. Specifically: + Item: Road part: The contractor does not have an explanation explaining the formwork construction work, the smoothing part connecting the residential concrete road (with a relatively large concrete volume of 20.87m3); There is no explanation presenting traffic safety work items; There is no explanation presenting the sewer outlet renovation work items; There is no explanation to present the work items of providing cohesive soil materials and transporting excess soil with a relatively large volume of cohesive soil supplied of 2,852.59m3 according to the required workload of E-HSMT. + Item: Bridge part: For Cua Ga bridge and Thanh Binh bridge: The contractor does not have an explanation explaining the demolition work of the old reinforced concrete bridge structure; The work of driving Melaleuca piles to reinforce bridge abutments; The contractor did not provide a description of the bridge access road items; Category of traffic safety on the bridge access road. 2. The contractor's E-Bidding Documents presents technical measures that do not meet the requirements of the E-Bidding Documents stated in Point 1.2.1, Clause 1.2. Construction organization measures, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): + Specifically: The contractor has presented measures to organize construction. However, for the road section, the contractor did not have any explanation or presentation on construction methods for the sewer outlet renovation item; The contractor's bridge section has no explanation or presentation... (For details, see the attached Evaluation Report). Because the bidding system controls the number of words.
3 vn1300978867 Liên danh Nâng cấp, mở rộng Đường huyện 27 CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN NAM VIỆT ÂN - The contractor's E-Bidding Document presents technical measures that do not meet the requirements of the E-Bidding Documents stated at Point 1.1.5, Clause 1.1. Technical solutions, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): + Specifically: The Contractor has presented the technical solution at Point 1.5 page 11 to Point 1.8 page 12 Clause 1 Section I. THE REASONABILITY AND FEASIBILITY OF TECHNICAL SOLUTIONS AND CONSTRUCTION ORGANIZATION MEASURES SUITABLE WITH THE PROPOSAL ON CONSTRUCTION PROGRESS attached to the file "7. TECHNICAL SOLUTIONS AND CONSTRUCTION PHASES FOR CONSTRUCTION PROGRESS". However, the technical solution is not complete according to the requirements for the volume of work description of E-HSMT, is unreasonable, and does not follow the correct construction sequence. Therefore, the Expert Group unanimously agreed to evaluate this content as unsatisfactory.