Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn3801281372 |
CÔNG TY TNHH TRUNG NAM BÌNH PHƯỚC |
15.755.176.402,02 VND | 15.755.000.000 VND | 180 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn1200365722 | Liên danh Nâng cấp, mở rộng Đường huyện 27 | CÔNG TY TNHH XÂY DỰNG-THƯƠNG MẠI-DỊCH VỤ HỮU LỢI | - The contractor's E-Bidding Document presents technical measures that do not meet the requirements of the E-Bidding Documents stated at Point 1.1.5, Clause 1.1. Technical solutions, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): + Specifically: The Contractor has presented the technical solution at Point 1.5 page 11 to Point 1.8 page 12 Clause 1 Section I. THE REASONABILITY AND FEASIBILITY OF TECHNICAL SOLUTIONS AND CONSTRUCTION ORGANIZATION MEASURES SUITABLE WITH THE PROPOSAL ON CONSTRUCTION PROGRESS attached to the file "7. TECHNICAL SOLUTIONS AND CONSTRUCTION PHASES FOR CONSTRUCTION PROGRESS". However, the technical solution is not complete according to the requirements for the volume of work description of E-HSMT, is unreasonable, and does not follow the correct construction sequence. Therefore, the Expert Group unanimously agreed to evaluate this content as unsatisfactory. |
| 2 | vn1200674495 | CÔNG TY TRÁCH NHIỆM HỮU HẠN THƯƠNG MẠI-DỊCH VỤ-XÂY DỰNG PHƯỚC HÙNG | 1. The contractor's E-Bidding Documents presents technical measures that do not meet the requirements of the E-Bidding Documents stated at Point 1.1.5, Clause 1.1. Technical solutions, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): The contractor presented technical solutions for the construction work items of the project. However, the technical solution is not complete according to the requirements for the volume of work description of E-HSMT, is unreasonable, and does not follow the correct construction sequence. Therefore, the Expert Group unanimously agreed to evaluate this content as unsatisfactory. Specifically: + Item: Road part: The contractor does not have an explanation explaining the formwork construction work, the smoothing part connecting the residential concrete road (with a relatively large concrete volume of 20.87m3); There is no explanation presenting traffic safety work items; There is no explanation presenting the sewer outlet renovation work items; There is no explanation to present the work items of providing cohesive soil materials and transporting excess soil with a relatively large volume of cohesive soil supplied of 2,852.59m3 according to the required workload of E-HSMT. + Item: Bridge part: For Cua Ga bridge and Thanh Binh bridge: The contractor does not have an explanation explaining the demolition work of the old reinforced concrete bridge structure; The work of driving Melaleuca piles to reinforce bridge abutments; The contractor did not provide a description of the bridge access road items; Category of traffic safety on the bridge access road. 2. The contractor's E-Bidding Documents presents technical measures that do not meet the requirements of the E-Bidding Documents stated in Point 1.2.1, Clause 1.2. Construction organization measures, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): + Specifically: The contractor has presented measures to organize construction. However, for the road section, the contractor did not have any explanation or presentation on construction methods for the sewer outlet renovation item; The contractor's bridge section has no explanation or presentation... (For details, see the attached Evaluation Report). Because the bidding system controls the number of words. | |
| 3 | vn1300978867 | Liên danh Nâng cấp, mở rộng Đường huyện 27 | CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN NAM VIỆT ÂN | - The contractor's E-Bidding Document presents technical measures that do not meet the requirements of the E-Bidding Documents stated at Point 1.1.5, Clause 1.1. Technical solutions, Section 3. Technical evaluation standards in Chapter III: Bid evaluation standards (CHUONG III.pdf attached on the system): + Specifically: The Contractor has presented the technical solution at Point 1.5 page 11 to Point 1.8 page 12 Clause 1 Section I. THE REASONABILITY AND FEASIBILITY OF TECHNICAL SOLUTIONS AND CONSTRUCTION ORGANIZATION MEASURES SUITABLE WITH THE PROPOSAL ON CONSTRUCTION PROGRESS attached to the file "7. TECHNICAL SOLUTIONS AND CONSTRUCTION PHASES FOR CONSTRUCTION PROGRESS". However, the technical solution is not complete according to the requirements for the volume of work description of E-HSMT, is unreasonable, and does not follow the correct construction sequence. Therefore, the Expert Group unanimously agreed to evaluate this content as unsatisfactory. |