Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn1200667635 |
KHANH NHU LIMITED LIABILITY COMPANY (KHANH NHU CO., LTD) |
568.522.500 VND | 88.3 | 568.522.000 VND | 510 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn1300107997 | BENTRE CONSTRUCTION CONSULTANT JOINT STOCK COMPANY | Bidders whose technical E-Proposals do not meet the minimum score requirements in the E-Dossier. Specifically, the contractor achieved a technical score of 62.4/100 points < 70 points (minimum score) | |
| 2 | vn0313642372 | DUC KIEN CONSTRUCTION CONSULTANT COMPANY LIMITED | Technical score 85.4/100 points. However, the Contractor's E-Proposal does not meet the minimum score requirements in the specific E-HSMT: - Explanation of solutions and methodology: Detailed human resource chart, milestones, and time for mobilizing consulting positions (section 10.2, page 76, file MS06_PPL.KE KENH NGANG CG_FN_LOAD.pdf attached to the bidding documents) do not match the time and place of work with the list of experts participating in performing consulting services (excel file). vn0313642372_Tiendocongviec): + Chief supervisor: 3 months at the company, 10 months in the field, total time is 13 months. + Embankment construction supervision is 4 months at the company, 10 months in the field, total time is 14 months. + Supervising the installation of electrical equipment on the project is 2 months at the company, 2 months in the field, total time is 4 months. + Technical infrastructure construction supervision is 3 months at the company, 6 months in the field, total time is 9 months. + The time and duration of personnel mobilization are not consistent with the implementation plan and do not meet Section 14.3 E-CDNT – Chapter II. BIDDING DATA SHEET is "Bidder must propose working time of key personnel not shorter than 510 days/person". The expert team evaluated the score of the item Time and duration of personnel mobilization in accordance with the implementation plan and meeting the requirements of the E-HSMT as 0 points, the total score of item 3.6 Personnel arrangement is 2.1 points < 4.2 points, which is the minimum score required by the E-HSMT. + The contractor arranges a Supervisor to supervise embankment construction: Ho Sy Nghia, does not have professional qualifications, does not meet section 4, Key Personnel - Section 2. Technical evaluation standards, does not meet form No. 07 RESUME OF CONSULTANT of E-HSMT. The expert group rated 0 points |