Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn2600428270 |
THƯỜNG XUYÊN COMPANY LIMITED |
3.258.636.140 VND | 3.258.636.140 VND | 60 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn2600308706 | CÔNG TY TNHH HỒNG PHONG | + The level of meeting technical requirements of construction materials: The list of materials and materials mainly used construction works in Clause III, Chapter I part of the construction measure E-HSDT Contractor Statistor of materials put into service of the package of the package of some materials does not specify the details of 01 category, name of origin, technical standards such as steel types using 02 types of steel are: Hoa Phat and Viet Duc Steel; Unburnt bricks and terracotta bricks do not specify the type and origin. Do not meet the requirements of E-HSMT in section 3, Clause III Chapter V and technical evaluation criteria. + Knowledge of the contractor about the construction scene: There is explanation of content, no drawings attached. + Technical solutions and construction measures: - Explanation of construction measures: There is an explanation of sketchy construction measures, incomplete, not detailed; Specifically, measures to execute the following tasks: Sprinkle HDPE film, install HDPE pipes, construction of water chips, coarse sand layers and wall construction measures. - Drawing of construction measures: There is a drawing of the site of the executive and living area. There is no drawing of the total surface of the examination to publish the location of the Executive Committee and daily life; warehouse, material gathering yards and construction equipment; Drawing measures for construction of walls: There are illustrated drawings of construction walls and wiring measures. There is no drawing of scaffolding measures, wall construction floor. Drawings of concreting construction measures: There is no drawing of construction and construction of formwork, pouring and concrete lagoon. | |
| 2 | vn0901073042 | MINH KHANG XD ARCHITECTURE COMPANY LIMITED | + The level of meeting technical requirements of construction materials: There are details of the type and origin of the material inadequate details of the material origin; Do not meet the requirements of E-HSMT at Section 3, Clause III Chapter V. Specifically: E-HSDT Contractor: List of materials lacking unburnt brick materials (concrete bricks); Contractor materials declared many types, origin of many manufacturers, exploitation, and no technical standards for each type of material. + Technical solutions and construction measures: Measures construction of ground level + construction of garbage pit: The work of spreading water on the water, the yellow layer: E-HSDT proposes the construction sequence: Covering yellow sand onto the tube (primary fine filter layer): Spread the golden sand layer of 10–15 cm thick covering the top of the pipe => coating the water crushed rock (coarse filter layer): Spread the stone layer of 1x2 (or 0.5x1.5) thickness of 15–20 cm thick on the yellow sand layer => complete the bottom of the pit: Spread the coating according to the design E-HSMT: The bottom of the garbage hole is made up from the bottom to the top: Waterproofing HDPE membrane => 20cm thick water shavings + Arranging fishbone HDPE pipe system with perforated holes according to the standard to collect leachate, leading to wastewater treatment area => 10cm thick coarse sand to ensure TCVXVN 261: 2001. The positions of the hole are spreading HDPE membranes up to the top of the hole. CONSTRUCTION MEASURES OF HEALTH: Explanation of concrete construction measures; Nail reinforcement concrete, inadequate bracing concrete concrete (no explanation of processing measures to install formwork). |