Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0100775353 |
CIC TECHNOLOGY AND CONSULTANCY JOINT STOCK COMPANY |
1.999.686.000 VND | 89.2 | 1.999.686.000 VND | 35 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0107950519 | DBIM CONSTRUCTION JOINT STOCK COMPANY | Through review, the contractor provided documents but did not meet E-HSMT, so the investor sent Official Letter No. 1701/DDCN-KHDT dated July 7, 2025 requiring clarification of E-HSDXKT through the national bidding network. On July 9, 2025, the contractor issued doc After the evaluation, the contractor has a total technical score of 71.6 points, but the contractor does not reach the minimum required point for the content: BIM coordinating experts. Conclusion: From the contents stated, the contractor's E-HSDT does not meet the requirements of E-HSMT. | |
| 2 | vnz000002424 | Institute of Investment and Construction Management | Through review, the contractor provided documents but did not meet E-HSMT, so the investor sent Official Letter No. 1699/DDCN-KHDT dated July 7, 2025 requiring clarifying E-HSDXKT through the national bidding network. On July 9, 2025, the contractor issued a document at 0907/2025/CV-IICM attached to clarification documents, but still did not meet the requirements of E-HSMT. After the assessment, the contractor has a total technical score of 75.075 points, but the contractor does not reach the minimum required point for the following contents: HR layout; Key personnel. Conclusion: From the contents stated, the contractor's E-HSDT does not meet the requirements of E-HSMT. |
1 |
Theo yêu cầu nêu tại Điều khoản tham chiếu ở Chương V |
|