Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn0316635567 | 0316635567 | Liên danh BNG-CIC |
GREEN BNG ARCHITECTURE CONSTRUCTION JOINT STOCK COMPANY |
1.558.500.000 VND | 86.4 | 1.558.500.000 VND | 80 day | |||
| 2 | vn0100775353 | 0100775353 | Liên danh BNG-CIC |
CIC TECHNOLOGY AND CONSULTANCY JOINT STOCK COMPANY |
1.558.500.000 VND | 86.4 | 1.558.500.000 VND | 80 day |
| # | Contractor's name | Role |
|---|---|---|
| 1 | GREEN BNG ARCHITECTURE CONSTRUCTION JOINT STOCK COMPANY | main consortium |
| 2 | CIC TECHNOLOGY AND CONSULTANCY JOINT STOCK COMPANY | sub-partnership |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn0312066207 | 0312066207 | HOA DIEN PROJECT MANAGEMENT AND DESIGN CONSTRUCTION CORPORATION | Through review, the Contractor's E-Proposal provided documents but did not meet the E-HSMT, so the Investor issued Official Dispatch No. 1052/DDCN-KHDT dated May 18, 2026 requesting clarification via the National Bidding Network System. After the deadline for clarification, the Contractor did not have a written response. After evaluation, the contractor has a total technical score of 40.2 points < 70 minimum required points. At the same time, the contractor did not meet the minimum required score for the following content: - Experience and capacity; - Solutions and methodology; - Key personnel. |