Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0100529118 | Liên danh NCTK, S5 và Phú Lương |
Institute for Research anh Design of Schools |
4.882.468.860 VND | 925 | 4.882.000.000 VND | 35 day | |
| 2 | vn0106999543 | Liên danh NCTK, S5 và Phú Lương |
S5 GROUP JOINT STOCK COMPANY |
4.882.468.860 VND | 925 | 4.882.000.000 VND | 35 day | |
| 3 | vn0106855189 | Liên danh NCTK, S5 và Phú Lương |
PHU LUONG MECHANICAL ELECTRICAL COMPANY LIMITED |
4.882.468.860 VND | 925 | 4.882.000.000 VND | 35 day |
| # | Contractor's name | Role |
|---|---|---|
| 1 | Institute for Research anh Design of Schools | main consortium |
| 2 | S5 GROUP JOINT STOCK COMPANY | sub-partnership |
| 3 | PHU LUONG MECHANICAL ELECTRICAL COMPANY LIMITED | sub-partnership |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0100415537 | VIET NAM ARCHITECTURAL DESIGN AND CONSUL TANCY JOINT STOCK COMPANY | - The contractor only scored 221 points in the assessment of Solution and methodology, not meeting the minimum score required by E-HSMT (minimum 280 points); - Bidders only scored 60 points in the assessment of Approach and Methodology, not meeting the minimum score required by E-HSMT (minimum 70 points); - The contractor only scored 36 points in the assessment of Reasonable human resource arrangement, did not meet the minimum score required by E-HSMT (minimum 70 points); | |
| 2 | vn0101657786 | AST-COTANA | AST ARCHITECTURE AND CONSTRUCTION JOINT STOCK COMPANY | - The contractor only scored 249 points in the assessment of Solution and methodology, not meeting the minimum score required by E-HSMT (minimum 280 points); - The contractor only scored 50 points in the evaluation content of the Implementation Plan, did not meet the minimum score required by the E-HSMT (minimum 70 points); - The contractor only scored 36 points in the assessment of Reasonable human resource arrangement, did not meet the minimum score required by E-HSMT (minimum 70 points); - Contractor proposes personnel to lead the design |
| 3 | vn0101481701 | AST-COTANA | COTANA CONSULTANT CONSTRUCTION JOINT STOCK COMPANY | - The contractor only scored 249 points in the assessment of Solution and methodology, not meeting the minimum score required by E-HSMT (minimum 280 points); - The contractor only scored 50 points in the evaluation content of the Implementation Plan, did not meet the minimum score required by the E-HSMT (minimum 70 points); - The contractor only scored 36 points in the assessment of Reasonable human resource arrangement, did not meet the minimum score required by E-HSMT (minimum 70 points); - Contractor proposes personnel to lead the design |