Exam public build build

        Watching
Tender ID
Views
2
Contractor selection plan ID
Bidding package name
Exam public build build
Bidding method
Online bidding
Tender value
7.820.347.000 VND
Publication date
17:55 21/12/2025
Contract Type
All in One
Domestic/ International
Domestic
Contractor Selection Method
Single Stage Single Envelope
Fields
Constructions
Approval ID
Số 78/QĐ-VHXH
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
Cao Phong Commune Culture and Society Department
Approval date
21/12/2025
Tendering result
There is a winning contractor
List of successful bidders
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Bid price Technical score Winning price Delivery time (days) Contract date
1 vn5400209157

CÔNG TY CỔ PHẦN XÂY DỰNG KINH DOANH TỔNG HỢP HÒA BÌNH

7.757.055.880 VND 7.757.056.000 VND 360 day
List of unsuccessful bidders:
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Reason for failure
1 vn0101809703 INDUSTRIAL INFRASTRUCTURE DEVELOPMENT AND CONSTRUCTION JOINT STOCK COMPANY The contractor does not meet the technical evaluation requirements in the following contents: + Does not meet the technical assessment at Point 1.2, Section 3, Chapter III of the E-HSMT: The Contractor presents the method of organizing the construction of the foundation structure including (foundation lining, foundation ring, foundation bracing) that is not consistent with the design and bidding documents: This project is designed with a strip foundation, not a pile foundation, so there is no foundation ring. + Does not meet the technical assessment at Point 2.2, Section 3, Chapter III of E-HSMT: Machine mobilization chart does not match the construction progress chart. + Does not meet the technical assessment at Point 2.3, Section 3, Chapter III of the E-HSMT: The progress chart lacks a tiled yard item (the contractor shows on the progress schedule a concrete yard).
You did not use the site, Click here to remain logged. Timeout: 60 second