Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn5400209157 |
CÔNG TY CỔ PHẦN XÂY DỰNG KINH DOANH TỔNG HỢP HÒA BÌNH |
7.757.055.880 VND | 7.757.056.000 VND | 360 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0101809703 | INDUSTRIAL INFRASTRUCTURE DEVELOPMENT AND CONSTRUCTION JOINT STOCK COMPANY | The contractor does not meet the technical evaluation requirements in the following contents: + Does not meet the technical assessment at Point 1.2, Section 3, Chapter III of the E-HSMT: The Contractor presents the method of organizing the construction of the foundation structure including (foundation lining, foundation ring, foundation bracing) that is not consistent with the design and bidding documents: This project is designed with a strip foundation, not a pile foundation, so there is no foundation ring. + Does not meet the technical assessment at Point 2.2, Section 3, Chapter III of E-HSMT: Machine mobilization chart does not match the construction progress chart. + Does not meet the technical assessment at Point 2.3, Section 3, Chapter III of the E-HSMT: The progress chart lacks a tiled yard item (the contractor shows on the progress schedule a concrete yard). |