Package 03 (construction and installation): Construction work

Tender ID
Views
18
Contractor selection plan ID
Bidding package name
Package 03 (construction and installation): Construction work
Bidding method
Online bidding
Tender value
5.183.563.000 VND
Publication date
16:25 27/08/2025
Contract Type
All in One
Domestic/ International
Domestic
Contractor Selection Method
Single Stage Single Envelope
Fields
Constructions
Approval ID
1504/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
People's Committee of Thong Nhat commune
Approval date
27/08/2025
Tendering result
There is a winning contractor
List of successful bidders
Number Business Registration ID ( on new Public Procuring System) Tax ID Consortium Name Contractor's name Bid price Technical score Winning price Adjusted bid price after excess deviation correction Bid package execution period Contract Period Contract date
1 vn3603685983 3603685983 LIÊN DANH ĐỊNH QUÁN

CÔNG TY TNHH TƯ VẤN THIẾT KẾ ĐO ĐẠC ĐẠI THÀNH

4.990.000.000 VND 4.990.000.000 VND 90 day
2 vn5801368789 5801368789 LIÊN DANH ĐỊNH QUÁN

CÔNG TY TNHH XÂY DỰNG HOÀNG CƯỜNG LÂM ĐỒNG

4.990.000.000 VND 4.990.000.000 VND 90 day
The system analyzed and found the following joint venture contractors:
List of unsuccessful bidders:
Number Business Registration ID ( on new Public Procuring System) Tax ID Consortium Name Contractor's name Reason for failure
1 vn3502272933 3502272933 Liên danh bến Nôm 2 MINH LONG CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED Technical proposals of contractors do not meet the requirements. Specifically: * Section 3.2.2 Construction technical measures: -Pursuant to point D of Section 3.2.2 Chapter III-E-HSMT Requirements: "There is a explanation of BPTC with drawings expressed as required, detailed, reasonable, in accordance with the design documents, construction planning order and construction conditions, current status of works and processes and regulations, according to the requirements specified in V-E-HS-HSMT". - Constructing measures of concrete road surface: According to the design documents and chapter V-E-HSMT the construction sequence: BTXM Road Road (1x2) CM M250 thick 20cm thick; Oil layer of oil separating; Granted 12cm thick shavings, tightly tight k≥0.98; Selective level 3 soil digging roads, tight dress K≥0.95. - Explanation of the construction measure proposed at point 2 item d. Measures for construction of BTXM stone road surface 1x2 m250: No explanation of construction measures to prevent dehydration with oil paper. - Drawing No. 61- Technical drawings attached E-HSMT, Section B Section I. Sewerage of Chapter V E-HSMT: Sewer system with woven structure and construction of precasting knitting sheets. The contractor does not explain and has drawings to show the construction measures for this part. - Measures for construction and installation of signs: Drawings of contractors propose construction and installation of signs not in accordance with the design solution page 59 Technical drawings attached to E-HSDT. * Section 3.3. Construction progress: The contractor proposes the chart of mobilizing equipment and equipment and construction equipment that does not match the construction schedule and explains the construction measures.
2 vn3600677342 3600677342 Liên danh bến Nôm 2 Công ty TNHH Đầu tư Xây dựng Lê Thuận Technical proposals of contractors do not meet the requirements. Specifically: * Section 3.2.2 Construction technical measures: -Pursuant to point D of Section 3.2.2 Chapter III-E-HSMT Requirements: "There is a explanation of BPTC with drawings expressed as required, detailed, reasonable, in accordance with the design documents, construction planning order and construction conditions, current status of works and processes and regulations, according to the requirements specified in V-E-HS-HSMT". - Constructing measures of concrete road surface: According to the design documents and chapter V-E-HSMT the construction sequence: BTXM Road Road (1x2) CM M250 thick 20cm thick; Oil layer of oil separating; Granted 12cm thick shavings, tightly tight k≥0.98; Selective level 3 soil digging roads, tight dress K≥0.95. - Explanation of the construction measure proposed at point 2 item d. Measures for construction of BTXM stone road surface 1x2 m250: No explanation of construction measures to prevent dehydration with oil paper. - Drawing No. 61- Technical drawings attached E-HSMT, Section B Section I. Sewerage of Chapter V E-HSMT: Sewer system with woven structure and construction of precasting knitting sheets. The contractor does not explain and has drawings to show the construction measures for this part. - Measures for construction and installation of signs: Drawings of contractors propose construction and installation of signs not in accordance with the design solution page 59 Technical drawings attached to E-HSDT. * Section 3.3. Construction progress: The contractor proposes the chart of mobilizing equipment and equipment and construction equipment that does not match the construction schedule and explains the construction measures.