Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn3603685983 | 3603685983 | LIÊN DANH ĐỊNH QUÁN |
CÔNG TY TNHH TƯ VẤN THIẾT KẾ ĐO ĐẠC ĐẠI THÀNH |
4.990.000.000 VND | 4.990.000.000 VND | 90 day | ||||
| 2 | vn5801368789 | 5801368789 | LIÊN DANH ĐỊNH QUÁN |
CÔNG TY TNHH XÂY DỰNG HOÀNG CƯỜNG LÂM ĐỒNG |
4.990.000.000 VND | 4.990.000.000 VND | 90 day |
| # | Contractor's name | Role |
|---|---|---|
| 1 | CÔNG TY TNHH TƯ VẤN THIẾT KẾ ĐO ĐẠC ĐẠI THÀNH | main consortium |
| 2 | CÔNG TY TNHH XÂY DỰNG HOÀNG CƯỜNG LÂM ĐỒNG | sub-partnership |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn3502272933 | 3502272933 | Liên danh bến Nôm 2 | MINH LONG CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED | Technical proposals of contractors do not meet the requirements. Specifically: * Section 3.2.2 Construction technical measures: -Pursuant to point D of Section 3.2.2 Chapter III-E-HSMT Requirements: "There is a explanation of BPTC with drawings expressed as required, detailed, reasonable, in accordance with the design documents, construction planning order and construction conditions, current status of works and processes and regulations, according to the requirements specified in V-E-HS-HSMT". - Constructing measures of concrete road surface: According to the design documents and chapter V-E-HSMT the construction sequence: BTXM Road Road (1x2) CM M250 thick 20cm thick; Oil layer of oil separating; Granted 12cm thick shavings, tightly tight k≥0.98; Selective level 3 soil digging roads, tight dress K≥0.95. - Explanation of the construction measure proposed at point 2 item d. Measures for construction of BTXM stone road surface 1x2 m250: No explanation of construction measures to prevent dehydration with oil paper. - Drawing No. 61- Technical drawings attached E-HSMT, Section B Section I. Sewerage of Chapter V E-HSMT: Sewer system with woven structure and construction of precasting knitting sheets. The contractor does not explain and has drawings to show the construction measures for this part. - Measures for construction and installation of signs: Drawings of contractors propose construction and installation of signs not in accordance with the design solution page 59 Technical drawings attached to E-HSDT. * Section 3.3. Construction progress: The contractor proposes the chart of mobilizing equipment and equipment and construction equipment that does not match the construction schedule and explains the construction measures. |
| 2 | vn3600677342 | 3600677342 | Liên danh bến Nôm 2 | Công ty TNHH Đầu tư Xây dựng Lê Thuận | Technical proposals of contractors do not meet the requirements. Specifically: * Section 3.2.2 Construction technical measures: -Pursuant to point D of Section 3.2.2 Chapter III-E-HSMT Requirements: "There is a explanation of BPTC with drawings expressed as required, detailed, reasonable, in accordance with the design documents, construction planning order and construction conditions, current status of works and processes and regulations, according to the requirements specified in V-E-HS-HSMT". - Constructing measures of concrete road surface: According to the design documents and chapter V-E-HSMT the construction sequence: BTXM Road Road (1x2) CM M250 thick 20cm thick; Oil layer of oil separating; Granted 12cm thick shavings, tightly tight k≥0.98; Selective level 3 soil digging roads, tight dress K≥0.95. - Explanation of the construction measure proposed at point 2 item d. Measures for construction of BTXM stone road surface 1x2 m250: No explanation of construction measures to prevent dehydration with oil paper. - Drawing No. 61- Technical drawings attached E-HSMT, Section B Section I. Sewerage of Chapter V E-HSMT: Sewer system with woven structure and construction of precasting knitting sheets. The contractor does not explain and has drawings to show the construction measures for this part. - Measures for construction and installation of signs: Drawings of contractors propose construction and installation of signs not in accordance with the design solution page 59 Technical drawings attached to E-HSDT. * Section 3.3. Construction progress: The contractor proposes the chart of mobilizing equipment and equipment and construction equipment that does not match the construction schedule and explains the construction measures. |