Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0400101958 | Liên danh Công ty Cổ phần tư vấn xây dựng công trình giao thông 5 – Phân viện Khoa học và Công nghệ giao thông vận tải Miền Trung. Tên viết tắt: TECCO5 – ITST Central |
TRANSPORT ENGINEERING CONSULTING JOINT STOCK COMPANY N05 |
4.500.000.000 VND | 90 | 4.500.000.000 VND | 12 month | |
| 2 | vn0400261045 | Liên danh Công ty Cổ phần tư vấn xây dựng công trình giao thông 5 – Phân viện Khoa học và Công nghệ giao thông vận tải Miền Trung. Tên viết tắt: TECCO5 – ITST Central |
Sub Institute of Transport Science and Technology in the Central Vietnam |
4.500.000.000 VND | 90 | 4.500.000.000 VND | 12 month |
| # | Contractor's name | Role |
|---|---|---|
| 1 | TRANSPORT ENGINEERING CONSULTING JOINT STOCK COMPANY N05 | main consortium |
| 2 | Sub Institute of Transport Science and Technology in the Central Vietnam | sub-partnership |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0102041238 | TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY | The contractor has a technical score of 85.8 points but does not meet the technical requirements because the score in the detailed standards of the contents in Section 3. Solution and methodology is lower than the minimum required score of EHSMT. Specifically: + In Section 3.5.1. Plan to implement all tasks to implement the bidding package (Gained 0 points, lower than the minimum required score of E-HSMT which is 1.2 points). + In Section 3.6.2. Time and duration of personnel mobilization (Gained 0 points, lower than the minimum required score of E-HSMT which is 1.8 points). |