Package 5: Equipment technical safety testing

      Watching
Tender ID
Bidding method
Direct bidding
Contractor selection plan ID
Bidding package name
Package 5: Equipment technical safety testing
Contractor Selection Type
Self -implementation
Estimated price
24.683.523 VND
Tender value
136.629.741 VND
Publication date
14:06 10/08/2026
Type of contract
All in One
Contractor Selection Method
Single Stage Single Envelope
Fields
Non-consulting
Domestic/ International
Domestic
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Approval ID
2549/QĐ-PCLĐ
Approval Entity
Lam Dong Power Company
Approval date
05/08/2026
Tendering result
There is a winning contractor
List of successful bidders
Number Business Registration ID ( on new Public Procuring System) Tax ID Consortium Name Contractor's name Bid price Technical score Winning price Adjusted bid price after excess deviation correction Bid package execution period Contract Period Contract date
1 vnz000022091 0300942001-013

CÔNG TY ĐIỆN LỰC LÂM ĐỒNG

24.683.523 VND 20 day The period between agreeing on the work and its completion should not exceed 20 days.