Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn4601128322 | 4601128322 |
CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ PHÁT TRIỂN HẠ TẦNG NGUYÊN CHƯƠNG |
399.617.587 VND | 399.617.587 VND | 45 day |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn1001132836 | 1001132836 | CÔNG TY TNHH TM & XD HOÀNG HÀ | E-HSDT of Hoang Ha Trading & Construction Co., Ltd. does not meet the technical requirements: * Do not meet the requirements at the evaluation criteria 3.2 E-HSMT, specifically: - There is no drawing of construction measures to demolish cement. - There is no measure to ensure no impact on the structure of the current situation during construction and demolition. * Do not meet the requirements at the evaluation criteria 3.3 E-HSMT, specifically: - The roof waterproofing construction drawing is not suitable for the construction process, the contractor presents waterproofing on the layer of the roof barrier. - The drawing of construction doors is not correct compared to the design; Designing galvanized steel doors, contractors presents construction and installation of aluminum and glass doors. * Do not meet the requirements at the evaluation criteria 6.2 E-HSMT, specifically: - Contractors do not present all solutions to minimize noise during the construction process. |