Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0105963625 |
THIEN BAO TRADING AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY |
10.835.263.085 VND | 10.835.263.000 VND | 120 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0104634917 | THIEN PHONG TRADE AND CONSTRUCTION JOINT STOCK COMPANY | (1) Content can clarify: - The contractor does not provide a contract in principle for providing repellents termites, plastic wall panels, light electrical equipment. - The contractor does not provide a contract for testing principles with registration business and Certificate of eligibility for specialized laboratory activities the lessor's construction industry. The above content can clarify. However, after evaluating the overall E-HSDT, the contractor does not meet the evaluation criteria in Point 3, Clause I, Section 3. Title Technical evaluation standards of E-HSMT. Therefore, the consulting unit does not request it clarify and evaluate according to the contractor's E-Bidding status. (2) Content does not meet requirements: - Does not meet the evaluation criteria in Point 3, Clause I, Section 3. Standards Technical assessment of E-HSMT: Construction methods for item: Cashew house Nurse B does not fully present the job, specifically: + The contractor did not present an explanation of the method of constructing the protective partition Creation and construction of light electrical systems and Internet networks. + The contractor did not present drawings of sanitary partition construction methods, Construction of light electrical systems and Internet networks. |