Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0101023733 | DONG ANH INVESMENT AND CONTRUCTION DEVELOPMENT JOINT STOCK COMPANY | The list of equipment with serial number 6.18 proposed by the Contractor does not meet the requirements of the E-HSMT. | |
| 2 | vn0107962553 | AN HUNG THINH TRADING AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY | The commitment to provide credit does not state the effective date of the commitment. On the other hand, in the E-HSMT at point b, section 30.2 E-CDNT also states "Commitment to provide additional credit after the bid closing time will not be considered and evaluated". | |
| 3 | vn5700614702 | CÔNG TY CỔ PHẦN PHÁT TRIỂN CÔNG NGHỆ XÂY DỰNG | In Technical requirements for materials and equipment installed in the project according to Point 2, Section III, Chapter V. Technical requirements in E-HSMT: In the Contractor's proposal, the lists have serial numbers. Orders 4, 5, 7 have parameters that are omitted or do not meet the requirements of the E-HSMT. | |
| 4 | vn5700509338 | CÔNG TY CỔ PHẦN THƯƠNG MẠI HƯƠNG QUỲNH | Do not supplement or clarify the E-Bidding Document at the request of the Procuring Entity. Specifically: Contract No. 02/2020/HD-XD dated October 10, 2020: No additional payment invoices; Failure to clarify erroneous information in the contract and acceptance record, including name of Investor, name of project - item, name of construction contractor, name of supervision consultant contractor; Key personnel, main construction equipment: Not supplemented or clarified at the request of the Procuring Entity. | |
| 5 | vn5300624720 | ANPHA CONSTRUCTION AND ENVIRONMENT JOINT-STOCK COMPANY | Unable to meet the Bidding Party's request for clarification on similar contract content in the E-bid. Specifically: Contract No. 38/2023/HD-XDCB dated October 25, 2023: No additional documents proving the type and level of the project (Decision No. 6366/QD-TUB dated September 18, 2023 does not clearly state type and level of construction) and one of the following documents: Construction settlement sheet, Contract liquidation record as required by E-HSMT. | |
| 6 | vn5701872230 | Liên danh Công ty TNHH MTV Xây Dựng Và Thương Mại 206 – Công ty TNHH Sản xuất và Thương mại Minh Đức Quảng Ninh | 206 CONSTRUCTION AND TRADE ONE MEMBER COMPANY LIMITED | Do not supplement or clarify the E-Bidding Document at the request of the Procuring Entity. |
| 7 | vn5700509320 | CÔNG TY TNHH THƯƠNG MẠI HẢI SƠN ĐÔNG TRIỀU | In Technical requirements for materials and equipment installed in the project according to Point 2, Section III, Chapter V. Technical requirements in E-HSMT: Proposed schedule in Contractor's construction measures, lists Items with serial numbers 7.3, 7.7, 8.2, 9.5, 9.6, 9.7 have parameters that are omitted or do not meet the requirements of the E-HSMT. | |
| 8 | vn5701823498 | Liên danh Công ty TNHH MTV Xây Dựng Và Thương Mại 206 – Công ty TNHH Sản xuất và Thương mại Minh Đức Quảng Ninh | CÔNG TY TNHH SẢN XUẤT VÀ THƯƠNG MẠI MINH ĐỨC QUẢNG NINH | Do not supplement or clarify the E-Bidding Document at the request of the Procuring Entity. |