Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn1000213793 |
THANG LONG INVESTMENT EXPORT-IMPORT JOINT STOCK COMPANY |
79.479.265.023,588 VND | 79.479.265.023 VND | 439 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0107421240 | Liên danh Sông Đuống - 207 - Constrexim8 | CÔNG TY CỔ PHẦN XÂY DỰNG SÔNG ĐUỐNG | The E-bid of the contractor Song Duong – 207 – Constrexim8 Joint Venture does not meet technical requirements due to: * Does not meet the requirements in evaluation criteria 2.1, chapter III of E-HSMT, specifically: - Drawings of total site construction measures do not show electricity supply, water supply, or communication. * Does not meet the requirements in evaluation criteria 3.1, chapter III of E-HSMT, specifically: - The drawing of the surveying solution to locate the project is not specific according to the coordinates sent in the design documents. * Does not meet the requirements in evaluation criteria 3.2, chapter III of E-HSMT, specifically: - There is no drawing of how to drive bamboo piles to reinforce the foundation across the pond. * Does not meet the requirements in evaluation criteria 3.4, chapter III of E-HSMT, specifically: - Manhole construction drawings do not comply with the design (the design uses unburnt bricks, the contractor uses only bricks) - There is no solution for constructing vertical sewers D=0.6M. * Does not meet the requirements in evaluation criteria 3.5, chapter III of the E-HSMT, specifically: - There are no construction drawings for the sewer guide plate, no construction drawings for installing the sewer railing (4x3)m. * Does not meet the requirements in evaluation criteria 3.6, chapter III of E-HSMT, specifically: - The light pole drawing is not according to the design. * Does not meet the requirements in evaluation criteria 4.1, chapter III of E-HSMT, specifically: - The current progress shows that the carpet construction is almost completed before constructing the median strip, which is not appropriate because the median strip must be completed before the median strip can be carpeted. |
| 2 | vn0102239132 | Liên danh Sông Đuống - 207 - Constrexim8 | 207 WORKS JOINT STOCK COMPANY | The E-bid of the contractor Song Duong – 207 – Constrexim8 Joint Venture does not meet technical requirements due to: * Does not meet the requirements in evaluation criteria 2.1, chapter III of E-HSMT, specifically: - Drawings of total site construction measures do not show electricity supply, water supply, or communication. * Does not meet the requirements in evaluation criteria 3.1, chapter III of E-HSMT, specifically: - The drawing of the surveying solution to locate the project is not specific according to the coordinates sent in the design documents. * Does not meet the requirements in evaluation criteria 3.2, chapter III of E-HSMT, specifically: - There is no drawing of how to drive bamboo piles to reinforce the foundation across the pond. * Does not meet the requirements in evaluation criteria 3.4, chapter III of E-HSMT, specifically: - Manhole construction drawings do not comply with the design (the design uses unburnt bricks, the contractor uses only bricks) - There is no solution for constructing vertical sewers D=0.6M. * Does not meet the requirements in evaluation criteria 3.5, chapter III of the E-HSMT, specifically: - There are no construction drawings for the sewer guide plate, no construction drawings for installing the sewer railing (4x3)m. * Does not meet the requirements in evaluation criteria 3.6, chapter III of E-HSMT, specifically: - The light pole drawing is not according to the design. * Does not meet the requirements in evaluation criteria 4.1, chapter III of E-HSMT, specifically: - The current progress shows that the carpet construction is almost completed before constructing the median strip, which is not appropriate because the median strip must be completed before the median strip can be carpeted. |
| 3 | vn0101850677 | Liên danh Sông Đuống - 207 - Constrexim8 | CONSTREXIM NO 8 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY | The E-bid of the contractor Song Duong – 207 – Constrexim8 Joint Venture does not meet technical requirements due to: * Does not meet the requirements in evaluation criteria 2.1, chapter III of E-HSMT, specifically: - Drawings of total site construction measures do not show electricity supply, water supply, or communication. * Does not meet the requirements in evaluation criteria 3.1, chapter III of E-HSMT, specifically: - The drawing of the surveying solution to locate the project is not specific according to the coordinates sent in the design documents. * Does not meet the requirements in evaluation criteria 3.2, chapter III of E-HSMT, specifically: - There is no drawing of how to drive bamboo piles to reinforce the foundation across the pond. * Does not meet the requirements in evaluation criteria 3.4, chapter III of E-HSMT, specifically: - Manhole construction drawings do not comply with the design (the design uses unburnt bricks, the contractor uses only bricks) - There is no solution for constructing vertical sewers D=0.6M. * Does not meet the requirements in evaluation criteria 3.5, chapter III of the E-HSMT, specifically: - There are no construction drawings for the sewer guide plate, no construction drawings for installing the sewer railing (4x3)m. * Does not meet the requirements in evaluation criteria 3.6, chapter III of E-HSMT, specifically: - The light pole drawing is not according to the design. * Does not meet the requirements in evaluation criteria 4.1, chapter III of E-HSMT, specifically: - The current progress shows that the carpet construction is almost completed before constructing the median strip, which is not appropriate because the median strip must be completed before the median strip can be carpeted. |