Package No. 3: Construction, installation and repair of 35kV transmission line, Do Nha 2 branch, Highway 371-E27.5; 35kV transmission line Giang Lieu branch, Mao Yen branch, Mao Doc branch 2, road 373-E27.5, 35kV line, Bong Lai branch, Pho Moi branch 3, road 375-E27.14, 35kV line, Dong Sai branch 1, Doan branch End 1, Phan Trung 3 branch, road 377-E27.14 - Que Vo district. Repairing 0.4kV power grid after Vu Duong, Nghiem Thon, Bong Lai 2, Han Da, Got, Nghiem Xa 2 substations - Que Vo district
Package No. 3: Construction, installation and repair of 35kV transmission line, Do Nha 2 branch, Highway 371-E27.5; 35kV transmission line Giang Lieu branch, Mao Yen branch, Mao Doc branch 2, road 373-E27.5, 35kV line, Bong Lai branch, Pho Moi branch 3, road 375-E27.14, 35kV line, Dong Sai branch 1, Doan branch End 1, Phan Trung 3 branch, road 377-E27.14 - Que Vo district. Repairing 0.4kV power grid after Vu Duong, Nghiem Thon, Bong Lai 2, Han Da, Got, Nghiem Xa 2 substations - Que Vo district