Package No. 36.2: Construction and installation of items: Roads, rainwater drainage, wastewater drainage, water supply, lighting, technical culverts, ditches and central ditches of the industrial park - phase 2 of the remaining phase 230.83ha again; Return irrigation canals (Inner Trung Drainage Canal; G22 Irrigation Canal; Doc Mo Canal; Noi Trung Temporary Canal N1)
Package No. 36.2: Construction and installation of items: Roads, rainwater drainage, wastewater drainage, water supply, lighting, technical culverts, ditches and central ditches of the industrial park - phase 2 of the remaining phase 230.83ha again; Return irrigation canals (Inner Trung Drainage Canal; G22 Irrigation Canal; Doc Mo Canal; Noi Trung Temporary Canal N1)
Name of project
Đầu tư phát triển kết cấu hạ tầng khu công nghiệp Thuận Thành I, huyện Thuận Thành, tỉnh Bắc Ninh