Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn0102205084 | 0102205084 |
VIC SOLUTION TECHNOLOGY AND CONSULTANT COMPANY LIMITED |
440.640.000 VND | 96 | 440.640.000 VND | 900 day |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn0109642037 | 0109642037 | E8 STUDIO TECHNOLOGY AND BUILDING JOINT STOCK COMPANY | The contractor with E-HSDT does not meet the minimum requirement point (27 points) for specific solutions and methodology: Solutions and methodology The total score is 20 points smaller than the minimum requirement of 27 points (items: approach and methodology; the implementation plan has a point less than the minimum point level) |