Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0401344833 |
TIN AN CONSTRUCTION CONSULTING JOINT STCOK COMPANY |
3.786.453.705,6 VND | 3.786.453.705 VND | 600 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0102131178 | CONSTRUCTION SURVEY AND CONSULTANCY VERIFY JOINT STOCK COMPANY | The contractor is assessed to meet technical requirements. However, the Contractor had an unusually low bid price (the bid price after discount was lower than 50% of the approved bid package price). After the clarification period expired, the contractor did not respond to clarify. The expert group did not accept the contractor's bid price. Do not determine the Composite Score to rank the contractor. | |
| 2 | vn0102224584 | VIETNAM PROJECT MANAGEMENT CONSULTING JOINT STOCK COMPANY | The contractor was re-evaluated as not meeting technical requirements. Reason: Does not meet the minimum score requirement for solution and methodology standards - staffing section. Contractors achieve 2.5 points < 3.75 which is the minimum required score. | |
| 3 | vn5900431946 | CÔNG TY TNHH TƯ VẤN THIẾT KẾ ĐẦU TƯ VÀ XÂY DỰNG PHÚ THỊNH GIA | The contractor is assessed as not meeting technical requirements. Reason: Does not meet minimum score requirements for solution and methodology standards. Contractors achieve 12.5 points < 26.25 which is the minimum required score. |
1 |
Tư vấn quản lý dự án Mở rộng Trường Đại học TDTT Đà Nẵng- giai đoạn 3 |
|