Repair patrol road along the factory fence; Repair fence from gate 4 to 110kv station; Paint outside wall of station LS03, LS04, LS05, reinforce cracked wall LS03, LS04; Laboratory door frames and emergency response warehouse doors; Repair of long conveyor belt fence (169.4m)
Repair patrol road along the factory fence; Repair fence from gate 4 to 110kv station; Paint outside wall of station LS03, LS04, LS05, reinforce cracked wall LS03, LS04; Laboratory door frames and emergency response warehouse doors; Repair of long conveyor belt fence (169.4m)
Name of project
Sửa chữa đường tuần tra dọc hàng rào nhà máy; Sửa chữa hàng rào từ cổng 4 lên trạm 110kv; Sơn mặt tường ngoài trạm LS03, LS04, LS05, gia cố tường nứt LS03, LS04; Các khung cửa phòng thí nghiệm và cửa kho ứng phó khẩn cấp; Sửa chữa hàng rào tuyến băng tải dài (169.4m)