Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn0313654265 | 0313654265 |
PHUC LIEM CONSTRUCTION INVESTMENT CONSULTANTS COMPANY LIMITED |
1.838.000.000 VND | 1.838.000.000 VND | 60 day |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn0106770104 | 0106770104 | Liên danh gói thầu IB2500201658 | GOLDEN BUILDING COMPANY LIMITED | Do not meet the technical evaluation criteria specified in "Section 3-Chapter III-E-HSMT" as follows: 1. Content of evaluation "Diagram and explanation of the contractor's management system at the construction site": - E-HSMT requires "There is a diagram (showing the personnel name and the job position of the personnel on the diagram)" ... - E-HSDT "There is a diagram (but on the diagram does not show the name of the commander's position; electric technical staff)" 2. The content of evaluation "Construction technical solution for bidding package" In the explanation of construction measures: E-HSDT explains the construction measures that are not suitable for the bidding package such as: - Private and cut components - Breaking core concrete and reinforcement - Remove wall tiles - Remove the wall mortar - Construction of brick wall tiles, stone -…. E-HSDT does not explain measures to construct the following tasks: - Massage the door manually - Paving stone steps, mortar labels 75 - Handling anti -stain ceiling - Install all kinds of lighting, lamps - Install 12W ceiling lights - Install 1.2m LED double tube light - Install electric cabinets 3. - E-HSMT requires "Detailed construction progress of all the work of the package" - E-HSDT proposes the schedule chart does not show the detailed construction progress of all the work of the bidding package. Specifically, it does not show some work as follows: - Demolition of stone steps - Demolition of non -reinforced concrete floor - Sxld the school name board with iron frame, aluminum background, aluminum border, bronze stainless steel and mica letters - Sxld the school name, text with mica, with lights behind the word - SXLD Name Table of stainless steel school, painted letters, breaking edges 2cm - Construction of rolling door box with alu - Processing of steel frame installation installed with zinc coated steel - Installation of reinforcing steel frame installed with zinc coated steel - Handling anti -stain ceiling - Install all kinds of lighting, lamps - Install 12W ceiling lights - Install 1.2m LED double tube light - Install a 1 -way switch switch + wall box - Scissors spread single wires, 1x2.5mm2 wire type ..... |
| 2 | vn0314763235 | 0314763235 | HTE GLOBAL COMPANY LIMITED | Do not meet the technical evaluation criteria specified in "Section 3-Chapter III-E-HSMT" as follows: 1. Content of evaluation "Construction technical solution for bidding package" In the explanation of construction measures: E-HSDT explains the construction measures that are not suitable for the bidding package such as: - Building brick walls, pouring linen, toning - Wall work - Brick wall tiles - Walking - Making plaster ceiling - Installation of doors, balconies - Granite tiles - Wood flooring; Construction of wallpaper -…. E-HSDT does not explain measures to construct the following tasks: - Shave the paint peeling on the wall; - Handling cracking of yard cracks; - Handling anti -stain ceiling - Paving stone steps, mortar labels 75 - Paving the floor hall hall A, Xm Mark 75 - Handling anti -stain ceiling - Construction of rolling door box with alu - Install 1.2m LED double tube light -…. | |
| 3 | vn0316409712 | 0316409712 | KY-MY ACE COMAPANY LIMITED | Do not meet the technical evaluation criteria specified in "Section 3-Chapter III-E-HSMT" as follows: 1. Content of evaluation "Construction technical solution for bidding package" In the technical explanation section. E-HSDT does not explain measures to construct the following tasks: - Stone pavement (E-HSDT stated that "the work of paving stones, the floor hall hall A, XM Market Mark 75". But only to explain the content of the hall hall and images, absolutely no explanation - Install all kinds of lighting, lamps - Install 12W ceiling lights - Install 1.2m LED double tube light - Cleaning works 2. - E-HSMT requires "Progress chart must be fully and reasonable (with task links)" ... - E-HSDT proposes "the schedule chart does not show the work link" 3. The content of the evaluation "lists all materials and equipment mainly used for works/bidding packages ..." - E-HSDT does not propose the name of the manufacturer of: Electrical cabinet - E-HSDT does not propose the origin of all supplies (except for stone steps; rolling door motor, rotary axis, burglary warning system; electric cabinet) 4. The content of evaluation "Quality assurance in the construction of jobs under the package" E-HSDT only proposes applicable standards but does not propose specific quality assurance measures in the construction of some basic work of the package such as: - Working and painting; - Tiles and stone work; - Waterproofing; - ... .. | |
| 4 | vn0304732252 | 0304732252 | MINH HOANG CONSTRUCTION COMPANY LIMITED | Do not meet the technical evaluation criteria specified in "Section 3-Chapter III-E-HSMT" as follows: 1. Content of evaluation "Diagram and explanation of the contractor's management system at the construction site": - E-HSMT requires "There is a diagram (showing the personnel name and the job position of the personnel on the diagram)" ... - E-HSDT "There is a diagram (but on the diagram does not show the name of the commander's position; electric technical staff)" 2. The content of evaluation "Construction technical solution for bidding package" E-HSDT does not have drawings of construction measures such as: - Working and painting; - Waterproofing; - Base paving work; - Installing electrical systems; -…. In the explanation of construction measures: E-HSDT explains the construction measures that are not suitable for the bidding package such as: - Construction work - Saning work E-HSDT does not explain measures to construct the following tasks: - Shave the paint peeling on walls, beams, columns, ceiling on the first floor of the main gate area - Install all kinds of lighting, lamps - Install 12W ceiling lights - Install 1.2m LED double tube light - Install electric cabinets 3. - E-HSMT requires "Progress chart must be fully and reasonable (with task links)" ... - E-HSDT proposes "the schedule chart does not show the work link" - E-HSMT requires "Detailed construction progress of all the work of the package" - E-HSDT proposes the schedule chart does not show the detailed construction progress of all the work of the bidding package. | |
| 5 | vn2500500572 | 2500500572 | Liên danh gói thầu IB2500201658 | BAC TRUNG NAM TRAFFIC AND CIVIL ENGINEERING JOINT STOCK COMPANY | Do not meet the technical evaluation criteria specified in "Section 3-Chapter III-E-HSMT" as follows: 1. Content of evaluation "Diagram and explanation of the contractor's management system at the construction site": - E-HSMT requires "There is a diagram (showing the personnel name and the job position of the personnel on the diagram)" ... - E-HSDT "There is a diagram (but on the diagram does not show the name of the commander's position; electric technical staff)" 2. The content of evaluation "Construction technical solution for bidding package" In the explanation of construction measures: E-HSDT explains the construction measures that are not suitable for the bidding package such as: - Private and cut components - Breaking core concrete and reinforcement - Remove wall tiles - Remove the wall mortar - Construction of brick wall tiles, stone -…. E-HSDT does not explain measures to construct the following tasks: - Massage the door manually - Paving stone steps, mortar labels 75 - Handling anti -stain ceiling - Install all kinds of lighting, lamps - Install 12W ceiling lights - Install 1.2m LED double tube light - Install electric cabinets 3. - E-HSMT requires "Detailed construction progress of all the work of the package" - E-HSDT proposes the schedule chart does not show the detailed construction progress of all the work of the bidding package. Specifically, it does not show some work as follows: - Demolition of stone steps - Demolition of non -reinforced concrete floor - Sxld the school name board with iron frame, aluminum background, aluminum border, bronze stainless steel and mica letters - Sxld the school name, text with mica, with lights behind the word - SXLD Name Table of stainless steel school, painted letters, breaking edges 2cm - Construction of rolling door box with alu - Processing of steel frame installation installed with zinc coated steel - Installation of reinforcing steel frame installed with zinc coated steel - Handling anti -stain ceiling - Install all kinds of lighting, lamps - Install 12W ceiling lights - Install 1.2m LED double tube light - Install a 1 -way switch switch + wall box - Scissors spread single wires, 1x2.5mm2 wire type ..... |