SCTX-2023 – 69 Supplying 110kV(TU) Voltage Transformers, 220kV(TU) Voltage Transformers Pha Lai Thermal Power Joint Stock Company

        Watching
Tender ID
Views
2
Contractor selection plan ID
Bidding package name
SCTX-2023 – 69 Supplying 110kV(TU) Voltage Transformers, 220kV(TU) Voltage Transformers Pha Lai Thermal Power Joint Stock Company
Bidding method
Online bidding
Tender value
7.603.030.600 VND
Publication date
15:20 15/02/2024
Contract Type
All in One
Domestic/ International
International
Contractor Selection Method
Single Stage Single Envelope
Fields
Goods
Approval ID
795/QĐ-PPC
Bidding documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
Pha Lai Thermal Power Joint Stock Company
Approval date
15/02/2024
Tendering result
There is a winning contractor

List of successful bidders

Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Bid price Technical score Winning price Delivery time (days) Contract date
1 vn0107052836

TCA VIET NAM EQUIPMENT AND TECHNOLOGY COMPANY LIMITED

5.391.665.400 VND 5.391.665.400 VND 120 day 16/02/2024

List of unsuccessful bidders:

Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Reason for bid slip
1 vn0107162250 Liên danh S-POWER - AT ENERGY CÔNG TY CỔ PHẦN CÔNG NGHỆ NĂNG LƯỢNG AT - The S-POWER - AT ENERGY joint venture is evaluated as Unsatisfactory in terms of experience and capacity for the following reasons: + Similar contracts of joint venture member AT Energy Technology Joint Stock Company - ENERGY do not meet the scale. + Contract No. 1203/2021/HD/EHCMC-A&T dated March 12, 2021 has the value of supplying materials and equipment with HS code: 85.04: 2,536,963,000 VND. Meanwhile, according to the TTLD, the contractor estimates the value The corresponding amount that members of the joint venture will pay is 50%, so the contractor's contract must meet ≥ 2,661,060,710 VND.
2 vn0400365598 TRUONG GIANG ELECTRIC JOINT STOCK COMPANY - Contractor's E-Bidding: Truong Giang Electric Joint Stock Company is assessed as: "Not meeting" technical requirements + E-HSDT does not quote the origin of accessories such as pole clamps for TU110kV and TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + Technical specifications are the rated capacitance of TU110kV type TYD123 that does not meet E-HSMT (does not meet TCCS 07:2021/EVN). The rated capacity of the capacitor is 20,000pF (According to TCCS 07:2021/EVN, the rated capacity of the capacitor is 6,000pF÷14,300pF). +
3 vn0100285020 EDH TECHNOLOGY DEVELOPMENT JOINT STOCK COMPANY Ranked No. 2
4 vn0106928415 SYSTECH HIGH VOLTAGE ENGINEERING DEVELOPMENT JOINT STOCK COMPANY - E-bid of the contractor: SYSTECH High Voltage Technical Development Joint Stock Company is assessed as: "Not meeting" technical requirements + E-HSDT does not quote the origin of accessories such as pole clamps for TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + The secondary wiring clamps of the TU110kV and TU220kV measurement coils do not have seal and lead clamp positions. + Technical specifications are the rated capacitance of TU110kV type DDB 145 that does not meet E-HSMT (does not meet TCCS 07:2021/EVN) and rated capacity
5 vn2900438512 Công ty cổ phần thương mại - Xây dựng - Cơ khí - Điện tự động hóa COMEECO và Công ty cổ phần thương mại và Tư vẫn xây dựng Điện Thăng Long (Viết tắt: Liên danh COMEECO - THĂNG LONG) COMEECO CONSTRUCTION-MECHANICAL-ELECTRIAL-TRADING JOINT STOCK COMPANY No. 3
6 vn3501565750 Liên danh Minh Anh - ECO MINH ANH ELECTRICAL & MECHANICAL COMPANY LIMITED 4th place
7 vn0901042929 Liên danh KNP- TB HYDRO TB HYDRO VIET NAM ENGINEERING AND EQUIPMENT COMPANY LIMITED - E-Bidding of the contractor: Joint venture KNP - HYDRO equipment is assessed as: "Does not meet" technical requirements. + E-HSDT does not quote the origin of accessories such as pole clamps for TU110kV and TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + The secondary wiring clamps of the TU110kV and TU220kV measurement coils do not have seal and lead clamp positions. + The E-Bidding Document does not provide the correct typetest documents for the bid goods DFK 245 with voltage conversion ratio: 220kV:√3/ 110V:√3/ 110V:√3/ 110V:√3 (E-Bidding Documents cun
8 vn0104595256 Công ty cổ phần thương mại - Xây dựng - Cơ khí - Điện tự động hóa COMEECO và Công ty cổ phần thương mại và Tư vẫn xây dựng Điện Thăng Long (Viết tắt: Liên danh COMEECO - THĂNG LONG) THANG LONG ELECTRICAL CONSTRUCTION CONSULTING AND TRADE JOINT STOCK COMPANY No. 3
9 vn0104222046 Liên danh S-POWER - AT ENERGY S – POWER JOINT STOCK COMPANY - The S-POWER - AT ENERGY joint venture is evaluated as Unsatisfactory in terms of experience and capacity for the following reasons: + Similar contracts of joint venture member AT Energy Technology Joint Stock Company - ENERGY do not meet the scale. + Contract No. 1203/2021/HD/EHCMC-A&T dated March 12, 2021 has the value of supplying materials and equipment with HS code: 85.04: 2,536,963,000 VND. Meanwhile, according to the TTLD, the contractor estimates the value The corresponding amount that members of the joint venture will pay is 50%, so the contractor's contract must meet ≥ 2,661,060,710 VND.
10 vn0106286662 Liên danh Minh Anh - ECO ECO ENERGY AND ENVIRONMENT JOINT STOCK COMPANY 4th place
11 vn0106456240 Liên danh KNP- TB HYDRO KNP VIETNAM JOINT STOCK COMPANY - E-Bidding of the contractor: Joint venture KNP - HYDRO equipment is assessed as: "Does not meet" technical requirements. + E-HSDT does not quote the origin of accessories such as pole clamps for TU110kV and TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + The secondary wiring clamps of the TU110kV and TU220kV measurement coils do not have seal and lead clamp positions. + The E-Bidding Document does not provide the correct typetest documents for the bid goods DFK 245 with voltage conversion ratio: 220kV:√3/ 110V:√3/ 110V:√3/ 110V:√3 (E-Bidding Documents cun

Bảng giá dự thầu của hàng hóa: See details

Number Menu of goods Amount Calculation Unit Origin Winning price/unit price (VND) Form Name
1
Máy biến điện áp (TU) Type: CVT Điện áp làm việc cao nhất của thiết bị: 123kV; Tần số định mức: 50Hz; Giới hạn tăng nhiệt độ: 65ºC; - Tỉ số 110kV: √3/110V: √3/110V: √3/110V: √3; - Cấp chính xác: 0,5-0,5-3P; - Công suát tải: 15VA-15VA-50VA; Điều kiện lắp đặt, vận hành: Ngoài trời; (Đáp ứng yêu cầu thông số, đặc tính kỹ thuật quy định tại TCCS 07:2021/EVN; số 104/QĐ-HĐTV ngày 21/9/2021.
6 Bộ (03 pha) GE/Ấn Độ 503.094.900 Bảng giá dự thầu của hàng hóa
2
Máy biến điện áp (TU) Type: CVT; Điện áp làm việc cao nhất của thiết bị: 245kV; Tần số định mức: 50Hz; Giới hạn độ tăng nhiệt đô: 65ºC; - Tỷ số 220kV:√3/ 110V:√3/ 110V:√3/ 110V:√3; - Cấp chính xác: 0,5-0,5-3P; - Công suất tải: 15VA-15VA-50VA; Điều kiện lắp đặt, vận hành: Ngoài trời;
4 Bộ (03 pha) GE/Ấn Độ 593.274.000 Bảng giá dự thầu của hàng hóa

Close

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8367 Projects are waiting for contractors
  • 1066 Tender notices posted in the last 24 hours
  • 1890 Contractor selection plan posted in the last 24 hours
  • 25326 Tender notices posted in the past month
  • 40496 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second