Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register
Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
---|---|---|---|---|---|---|---|---|
1 | vn0107052836 | TCA VIET NAM EQUIPMENT AND TECHNOLOGY COMPANY LIMITED |
5.391.665.400 VND | 5.391.665.400 VND | 120 day | 16/02/2024 |
Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for bid slip |
---|---|---|---|---|
1 | vn0107162250 | Liên danh S-POWER - AT ENERGY | CÔNG TY CỔ PHẦN CÔNG NGHỆ NĂNG LƯỢNG AT | - The S-POWER - AT ENERGY joint venture is evaluated as Unsatisfactory in terms of experience and capacity for the following reasons: + Similar contracts of joint venture member AT Energy Technology Joint Stock Company - ENERGY do not meet the scale. + Contract No. 1203/2021/HD/EHCMC-A&T dated March 12, 2021 has the value of supplying materials and equipment with HS code: 85.04: 2,536,963,000 VND. Meanwhile, according to the TTLD, the contractor estimates the value The corresponding amount that members of the joint venture will pay is 50%, so the contractor's contract must meet ≥ 2,661,060,710 VND. |
2 | vn0400365598 | TRUONG GIANG ELECTRIC JOINT STOCK COMPANY | - Contractor's E-Bidding: Truong Giang Electric Joint Stock Company is assessed as: "Not meeting" technical requirements + E-HSDT does not quote the origin of accessories such as pole clamps for TU110kV and TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + Technical specifications are the rated capacitance of TU110kV type TYD123 that does not meet E-HSMT (does not meet TCCS 07:2021/EVN). The rated capacity of the capacitor is 20,000pF (According to TCCS 07:2021/EVN, the rated capacity of the capacitor is 6,000pF÷14,300pF). + | |
3 | vn0100285020 | EDH TECHNOLOGY DEVELOPMENT JOINT STOCK COMPANY | Ranked No. 2 | |
4 | vn0106928415 | SYSTECH HIGH VOLTAGE ENGINEERING DEVELOPMENT JOINT STOCK COMPANY | - E-bid of the contractor: SYSTECH High Voltage Technical Development Joint Stock Company is assessed as: "Not meeting" technical requirements + E-HSDT does not quote the origin of accessories such as pole clamps for TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + The secondary wiring clamps of the TU110kV and TU220kV measurement coils do not have seal and lead clamp positions. + Technical specifications are the rated capacitance of TU110kV type DDB 145 that does not meet E-HSMT (does not meet TCCS 07:2021/EVN) and rated capacity | |
5 | vn2900438512 | Công ty cổ phần thương mại - Xây dựng - Cơ khí - Điện tự động hóa COMEECO và Công ty cổ phần thương mại và Tư vẫn xây dựng Điện Thăng Long (Viết tắt: Liên danh COMEECO - THĂNG LONG) | COMEECO CONSTRUCTION-MECHANICAL-ELECTRIAL-TRADING JOINT STOCK COMPANY | No. 3 |
6 | vn3501565750 | Liên danh Minh Anh - ECO | MINH ANH ELECTRICAL & MECHANICAL COMPANY LIMITED | 4th place |
7 | vn0901042929 | Liên danh KNP- TB HYDRO | TB HYDRO VIET NAM ENGINEERING AND EQUIPMENT COMPANY LIMITED | - E-Bidding of the contractor: Joint venture KNP - HYDRO equipment is assessed as: "Does not meet" technical requirements. + E-HSDT does not quote the origin of accessories such as pole clamps for TU110kV and TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + The secondary wiring clamps of the TU110kV and TU220kV measurement coils do not have seal and lead clamp positions. + The E-Bidding Document does not provide the correct typetest documents for the bid goods DFK 245 with voltage conversion ratio: 220kV:√3/ 110V:√3/ 110V:√3/ 110V:√3 (E-Bidding Documents cun |
8 | vn0104595256 | Công ty cổ phần thương mại - Xây dựng - Cơ khí - Điện tự động hóa COMEECO và Công ty cổ phần thương mại và Tư vẫn xây dựng Điện Thăng Long (Viết tắt: Liên danh COMEECO - THĂNG LONG) | THANG LONG ELECTRICAL CONSTRUCTION CONSULTING AND TRADE JOINT STOCK COMPANY | No. 3 |
9 | vn0104222046 | Liên danh S-POWER - AT ENERGY | S – POWER JOINT STOCK COMPANY | - The S-POWER - AT ENERGY joint venture is evaluated as Unsatisfactory in terms of experience and capacity for the following reasons: + Similar contracts of joint venture member AT Energy Technology Joint Stock Company - ENERGY do not meet the scale. + Contract No. 1203/2021/HD/EHCMC-A&T dated March 12, 2021 has the value of supplying materials and equipment with HS code: 85.04: 2,536,963,000 VND. Meanwhile, according to the TTLD, the contractor estimates the value The corresponding amount that members of the joint venture will pay is 50%, so the contractor's contract must meet ≥ 2,661,060,710 VND. |
10 | vn0106286662 | Liên danh Minh Anh - ECO | ECO ENERGY AND ENVIRONMENT JOINT STOCK COMPANY | 4th place |
11 | vn0106456240 | Liên danh KNP- TB HYDRO | KNP VIETNAM JOINT STOCK COMPANY | - E-Bidding of the contractor: Joint venture KNP - HYDRO equipment is assessed as: "Does not meet" technical requirements. + E-HSDT does not quote the origin of accessories such as pole clamps for TU110kV and TU220kV. The Contractor was requested to clarify, but after clarifying, he did not respond. + The secondary wiring clamps of the TU110kV and TU220kV measurement coils do not have seal and lead clamp positions. + The E-Bidding Document does not provide the correct typetest documents for the bid goods DFK 245 with voltage conversion ratio: 220kV:√3/ 110V:√3/ 110V:√3/ 110V:√3 (E-Bidding Documents cun |
Number | Menu of goods | Amount | Calculation Unit | Origin | Winning price/unit price (VND) | Form Name |
---|---|---|---|---|---|---|
1 | Máy biến điện áp (TU) Type: CVT Điện áp làm việc cao nhất của thiết bị: 123kV; Tần số định mức: 50Hz; Giới hạn tăng nhiệt độ: 65ºC; - Tỉ số 110kV: √3/110V: √3/110V: √3/110V: √3; - Cấp chính xác: 0,5-0,5-3P; - Công suát tải: 15VA-15VA-50VA; Điều kiện lắp đặt, vận hành: Ngoài trời; (Đáp ứng yêu cầu thông số, đặc tính kỹ thuật quy định tại TCCS 07:2021/EVN; số 104/QĐ-HĐTV ngày 21/9/2021. |
6 | Bộ (03 pha) | GE/Ấn Độ | 503.094.900 | Bảng giá dự thầu của hàng hóa |
2 | Máy biến điện áp (TU) Type: CVT; Điện áp làm việc cao nhất của thiết bị: 245kV; Tần số định mức: 50Hz; Giới hạn độ tăng nhiệt đô: 65ºC; - Tỷ số 220kV:√3/ 110V:√3/ 110V:√3/ 110V:√3; - Cấp chính xác: 0,5-0,5-3P; - Công suất tải: 15VA-15VA-50VA; Điều kiện lắp đặt, vận hành: Ngoài trời; |
4 | Bộ (03 pha) | GE/Ấn Độ | 593.274.000 | Bảng giá dự thầu của hàng hóa |
Close
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.