Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0303615450 |
THUAN DA CONSTRUCTION INVESTMENT CONSULT CO., LTD |
925.000.000 VND | 925.000.000 VND | 220 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0309116803 | NEW TECHNOLOGY TRADING SERVICE CONSTRUCTION COMPANY LIMITED | The contractor has a total technical score of 85.5 points larger than the total required score of 70 points. However, the score at Section 3.6 Solutions and methodology has a smaller evaluation point than the minimum requirement, so the evaluation does not meet the technical, specifically as follows: - Section 3.6 The contractor is considered to be 3.5 points <7 minimum points. |