Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0305667729 |
Công ty trách nhiệm hữu hạn xây dựng thương mại Tín Lợi |
2.285.782.259,76 VND | 2.285.000.000 VND | 120 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn3701501948 | MES MECHANICAL & ELECTRIAL SOLUTION JOINT STOCK COMPANY | Rank III | |
| 2 | vn1301093296 | CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI LINH KHÔI | The contractor's E-HSDT does not meet the requirements of E-HSMT in the technical evaluation standard table, point 1.2. CONSTRUCTION MEASURES (1.2.1), Clause 1. Reasonable and feasibility of technical solutions and construction measures in accordance with the proposal of construction progress, Section 3. Criteria for evaluating bids, specifically as follows: + Contractors do not present the following construction measures: Installing MCB, Contactor Installation, Installation of Excessive Protection Equipment and Lightning Protection, Timer Installation using Smart Fone, Handwares installation (iron momentum) of all kinds, ... - The contractor does not meet the requirements of the bidding dossier in Clause 3. The project management method includes: Project management organization, scene management organization, Section 3. The criteria for evaluating bids, specifically as follows: The contractor has the organizational chart of the human resource management apparatus on the construction site and explains the diagram that does not comply with the requirements of E-HSMT (the bidding documents do not require and the bidding documents do not arrange additional personnel position as follows: Captain Case) | |
| 3 | vn1400353072 | MINH THANH LIMITED COMPANY | The contractor's E-HSDT does not meet the requirements of E-HSMT in the technical evaluation standard table, point 1.2. CONSTRUCTION MEASURES (1.2.1), Clause 1. Reasonable and feasibility of technical solutions and construction measures in accordance with the proposal of construction progress, Section 3. Criteria for evaluating bids, specifically as follows: + Contractors do not present the following measures to execute the following tasks: Installing MCB, Contactor Installation, Installation of Excessive Protection Equipment and Lightning Protection, Timer Installation of Smart Fone, Installation of 3G Wifi Modem transmitter, Manual beam installation (iron momentum) of all kinds, measuring resistance at the scene, ... | |
| 4 | vn1201620728 | THAP TRI COMPANY LIMITED | The Management Board of the Project and Development of My Tho City Land Fund (Bidding Invitation) has Official Letter No. 953/QLDA dated May 5, 2025 on clarifying and supplementing the bidding documents Package No. 02: Construction construction of the project: Lighting system 4+5+6+7+9+10+11+11+19+20, Ward 2 has been posted and clarified by the Bidding Co., Ltd.) National electronics (https://muasamcong.mpi.gov.vn) at 14:50, May 5, 2025 according to the request code CBD2500052109. Accordingly, the time limit for additional reply and clarification (at 17:00, May 8, 2025) the contractor has no dispatch or additional response documents, clarifying on the national electronic bidding network to respond to the request of Official Letter 953/QLDA dated May 5, 2025 of the bid party and bidding invitation dossier | |
| 5 | vn2001152249 | CÔNG TY TNHH XÂY DỰNG TỔNG HỢP LỘC THỊNH PHÁT | Rank II |