Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn1200701886 |
CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG-THƯƠNG MẠI VINH QUANG |
8.058.961.183,42 VND | 8.058.000.000 VND | 120 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn3701501948 | MES MECHANICAL & ELECTRIAL SOLUTION JOINT STOCK COMPANY | -E-HSDT of the contractor does not meet the requirements of E-HSMT at the technical evaluation standard table at Point 1.1. Technical solutions (1.1.2. Organizing construction sites), Clause 1. Reasonable and feasibility of technical solutions, construction measures in accordance with the proposal of construction progress, section 3. Criteria for evaluating bids, specifically as follows: + Contractors with drawings arranging construction ground are not feasible for the bidding package (not shown to be arranged in any position for the current status of construction works) -E-HSDT of the contractor does not meet the requirements of E-HSMT in the technical evaluation standard table at 5.3. Labor safety (5.3.2. Arranging the implementation costs to ensure occupational safety), 5. Ensuring environmental sanitation conditions and other conditions such as fire prevention, fighting, labor safety, section 3. Criteria for evaluating bids, specifically as follows: + The contractor has the arrangement of expenses to ensure labor safety inappropriate of the current law (Clause 1, Article 15 of Circular 10/2021/TT-BXD dated August 25, 2021 on guiding a number of articles and measures to implement Decree No. 06/2021/ND-CP dated January 26, 2021 and Decree No. 44/2016/ND-CP of May 15, 2016 of the Government) | |
| 2 | vn1800647768 | CÔNG TY CP HƯNG THỊNH PHÁT | -E-HSDT of the contractor does not meet the requirements of E-HSMT in the technical evaluation standard table, point 1.2. CONSTRUCTION MEASURES (1.2.1), Clause 1. Reasonable and feasibility of technical solutions and construction measures in accordance with the proposal of construction progress, Section 3. Criteria for evaluating bids, specifically as follows: + The contractor shall implement the construction measure of the construction of pillars (centrifugal concrete pillars) after performing the installation of formwork and pouring foundation of the cylindrical foundation is not appropriate, not in accordance with the implementation order. + The contractor does not present the following measures to execute the following work: Installing MCB, Contactor Installation, Installation of Excessive Protection Equipment and Lightning Protection, Timer Installation of Smart Fone, Installation of 3G Wifi Modem transmitter, Measuring resistance at the scene, ... -E-HSDT of the contractor does not meet the requirements of E-HSMT in the technical evaluation standard table, point 2.2. Consistency, Clause 2. Construction level, Section 3. Technical evaluation criteria under Chapter III. Criteria for evaluating bids, specifically as follows: + Materials charts are not suitable for the construction schedule chart (Progress of the supplies and supplies of the Midwinem Materials from the beginning to the 60th day, while the work schedule chart of work content: Installation of lights, lights, installation of lighting cabinets, geomorphic installation, ... Contractors implemented from the 75th onwards) | |
| 3 | vn0314683558 | KMC TECHNOLOGY COMPANY LIMITED | -E-HSDT of the contractor does not meet the requirements of E-HSMT at the technical evaluation standard table at Point 1.1. Technical solutions (1.1.2. Organizing construction sites), Clause 1. Reasonable and feasibility of technical solutions, construction measures in accordance with the proposal of construction progress, section 3. Criteria for evaluating bids, specifically as follows: + Contractors with drawings arranging construction ground are not feasible for the bidding package (not shown to be arranged in any position for the current status of construction works) -E-HSDT of the contractor does not meet the requirements of E-HSMT at the technical evaluation standard table at Point 2.3. Detailed construction schedule, feasible in accordance with technical proposals and meet the requirements of E-HSMT, Clause 2. Construction level, Section 3. Technical evaluation standards under Chapter III. Criteria for evaluating bids, specifically as follows: + At page 1 of the file "2.2 - Explanation of the construction progress" of the contractor attached to the bids, the content of the construction progress of the contractor presented: The preparation work to start the work: 20 days, construction of works items: 100 days is not suitable compared to the construction progress graph (construction preparation work: 20 days, construction content: 120 days) | |
| 4 | vn1400353072 | MINH THANH LIMITED COMPANY | -E-HSDT of the contractor does not meet the requirements of E-HSMT at the technical evaluation standard table at Point 2.3. Detailed construction schedule, feasible in accordance with technical proposals and meet the requirements of E-HSMT, Clause 2. Construction level, Section 3. Technical evaluation standards under Chapter III. Criteria for evaluating bids, specifically as follows: + Table of detailed construction progress of the contractor does not show the work of measuring the resistance at the scene, so it is not suitable compared to the content of technical proposals (the contractor has the explanation and presentation of the resistance work at the scene) |