Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn5701811407 |
CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN AN HƯNG 69 |
2.856.000.199,29 VND | 2.856.000.000 VND | 60 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0109882381 | CAPITAL CONSTRUCTION INVESTMENT AND TRADING DEVELOPMENT COMPANY LIMITED | - In section 2.2 "Explanation of construction methods and drawings of construction methods for each job in the items of the bidding estimate": Drawings of detailed construction methods: The contractor lacks drawings of detailed construction methods. - In section 3.2 "Making a detailed total construction progress chart for each job of each item in the bidding estimate": The contractor only prepares a construction progress table for stages and construction items. Do not chart the total detailed construction progress for each job of each item in the bidding estimate. |