Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn2901014347 | 2901014347 | CÔNG TY CP XÂY DỰNG QUANG TIẾN | The investor sent Official Letter No. 800/DHV-KHTC dated July 22, 2025 on the national bidding network but the contractor did not come to compare documents. | |
| 2 | vn2901140937 | 2901140937 | CÔNG TY TNHH PHÚ HÀ AN | The contractor does not prove the capacity of the technical staff has declared and attached, as well as the ability to mobilize this personnel to carry out the bidding package. In addition, the contractor does not propose the main materials at the request of the Bidding Documents at Point 7.1 - Section 3 - Chapter III (E -HSMT attachment) and Section III - Chapter V (E -HSMT attachment). | |
| 3 | vn3002165644 | 3002165644 | Liên danh Nhà học D3 | CÔNG TY TNHH XÂY DỰNG VÀ VẬN TẢI THÀNH ĐÔ | The contractor fails to prove the capacity of the commanders and officials in charge of occupational safety as the declaration as the ability to mobilize personnel to implement the bidding package. In addition, the contractor does not propose the main materials at the request of the Bidding Documents at Point 7.1 - Section 3 - Chapter III (E -HSMT attachment) and Section III - Chapter V (E -HSMT attachment). |
| 4 | vn3002127529 | 3002127529 | Liên danh Nhà học D3 | CÔNG TY CP XÂY DỰNG & THƯƠNG MẠI TUẤN KHANG | The contractor fails to prove the capacity of the commanders and officials in charge of occupational safety as the declaration as the ability to mobilize personnel to implement the bidding package. In addition, the contractor does not propose the main materials at the request of the Bidding Documents at Point 7.1 - Section 3 - Chapter III (E -HSMT attachment) and Section III - Chapter V (E -HSMT attachment). |