Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0101936010 |
PHONG CHAU JOINT STOCK COMPANY |
3.343.980.783 VND | 3.343.980.783 VND | 45 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn5701914434 | CÔNG TY TNHH ĐẦU TƯ PHÁT TRIỂN NHÀ VÀ HẠ TẦNG CẨM PHẢ | Do not meet the technical requirements stated in E-HSMT because the contractor does not meet the following criteria: + Section 2.1 Organization of the construction site: The layout of the construction site is not consistent with the status quo, the nature of the job: The contractor is expected to arrange too many temporary buildings with corrugated iron roof frame such as: security house, construction command committee, warehouse, clinic, cafeteria, motel between shift It will not be feasible for the narrow ground in the agency. The working area of the agency is inappropriate to be a camp for workers The total drawing of the ground shows: Arranging the mixers and removable materials at B030's home, B010 house is not suitable because this item only replaces aluminum glass doors, corrugated iron roofs do not use bricks, sand, mortar. + Section 2.2 Construction work: The contractor proposes to arrange the construction direction from the bottom to this, which is not suitable for the demolition (page 9 explanation of BPTC) + Section 3.1 Quality management: Contractors bring quality preservation measures some work that are not suitable for the work in the bidding package (for example, the contractor offers construction of iron welding doors to the window door (page 34) instead of construction of aluminum doors, construction of ceiling, aluminum ceiling (page 34) instead of plastic ceiling construction ...) + Section 3.2 Management of documents, records, drawings of completion, acceptance and settlement: There are suggestions but very sketchy, lack of content, on the other hand, many content is not suitable for this project + Section 3.3 Safety management on the construction site: The contractor has not yet stated the safety measures for each construction stage. + Section 3.4 Safety management for works and residents around the construction site: The contractor has not taken measures to minimize the effect of normal activities of the agency. There is no overall diagram that can show the location of solid waste gathering | |
| 2 | vn5701818473 | CÔNG TY TNHH KIẾN TRÚC XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG BẮC | Do not meet the technical requirements stated in E-HSMT because the contractor does not meet the following criteria: + Section 2.1 Organization of the construction site: The layout of the construction site is not consistent with the status quo, the nature of the job: The contractor uses a barrier around the B010 house without opening the path for officials to go in and out of this building, not guaranteeing the work of the building. The contractor explains the total ground for the building, not the bidding package. + Section 2.2 Construction work: The contractor proposes to be constructed by a rolling method, completing each building, industrial hygiene and then moving to the next building (page 18), not suitable for the construction progress graph (construction of customs building and administrative building simultaneously) Many construction work is not suitable for the project (the dismantling of the door, the contractor is writing for the type of wooden doors with wooden frames while the status quo is aluminum glass doors; + Section 3.4 Safety management for works and residents around the construction site: The contractor is explaining general and writing for the work of the school package, the medical station, not suitable for the status of the project + Section 4.3 Table of construction progress: The construction schedule chart is not consistent with the technical proposal (in the technical proposal of the contractor propose construction by the rolling method, completing the construction of each building, industrial hygiene and then moving to the next building, but in the progress of 2 customs buildings and administrative buildings under construction simultaneously) + Section 7.1 Measures to ensure reasonable and feasible environmental sanitation in accordance with the proposal on construction methods: Contractors bring solutions: In case the waste of the construction site is not collected by the environmental sanitation agency, the contractor must dig at the end of the wind, the soil is less waterproof for burial (page 76) |