The entire volume of construction and installation of construction equipment

Tender ID
Views
7
Contractor selection plan ID
Bidding package name
The entire volume of construction and installation of construction equipment
Bidding method
Online bidding
Tender value
121.389.284.000 VND
Estimated price
121.389.031.000 VND
Publication date
15:15 05/09/2023
Contract Type
Fixed unit price
Domestic/ International
Domestic
Contractor Selection Method
Single Stage Two Envelopes
Fields
Constructions
Approval ID
183/QĐ-BQLDA
Bidding documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
Project Management Board for investment in construction of civil and industrial works in Binh Dinh province
Approval date
29/08/2023
Tendering result
There is a winning contractor

List of successful bidders

Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Bid price Technical score Winning price Delivery time (days) Contract date
1 vn4000443802 Liên danh Công ty TNHH Đầu tư xây dựng DACINCO – Công ty Cổ phần kỹ thuật xây dựng Đại Tường

DACINCO CONSTRUCTION INVESTMENT LIMITED COMPANY

121.238.738.701,27 VND 95.3 121.238.738.701 VND 540 day 29/08/2023
2 vn0309142377 Liên danh Công ty TNHH Đầu tư xây dựng DACINCO – Công ty Cổ phần kỹ thuật xây dựng Đại Tường

DAI TUONG ENGINEERING CONSTRUCTION JOINT STOCK COMPANY

121.238.738.701,27 VND 95.3 121.238.738.701 VND 540 day 29/08/2023

List of unsuccessful bidders:

Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Reason for bid slip
1 vn4100362466 Liên danh Công ty TNHH Công nghệ & Xây dựng Nam Ngân – Công ty TNHH Hương Giang – Công ty TNHH Kiểu Việt (Tên viết tắt:Liên danh Nam Ngân – Hương Giang – Kiểu Việt) CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN Criterion 4 on Construction Progress, the Contractor proposes a schedule until January 15, 2024 to complete the rough part (Foundation and reinforced concrete structure of the category of Surgery, Obstetrics, and Anesthesia Treatment Houses). recovery). Failure to meet progress as required by E-HSMT. Criterion 7 on Warranty, Maintenance, and Maintenance: The Contractor does not state a plan for operating the air conditioning system; Instructions for use, training, operation, technology transfer and exploitation of medical gas systems.
2 vn4101031925 Liên danh Công ty TNHH Công nghệ & Xây dựng Nam Ngân – Công ty TNHH Hương Giang – Công ty TNHH Kiểu Việt (Tên viết tắt:Liên danh Nam Ngân – Hương Giang – Kiểu Việt) CÔNG TY TNHH HƯƠNG GIANG Criterion 4 on Construction Progress, the Contractor proposes a schedule until January 15, 2024 to complete the rough part (Foundation and reinforced concrete structure of the category of Surgery, Obstetrics, and Anesthesia Treatment Houses). recovery). Failure to meet progress as required by E-HSMT. Criterion 7 on Warranty, Maintenance, and Maintenance: The Contractor does not state a plan for operating the air conditioning system; Instructions for use, training, operation, technology transfer and exploitation of medical gas systems.
3 vn4100596520 Liên danh Công ty TNHH Công nghệ & Xây dựng Nam Ngân – Công ty TNHH Hương Giang – Công ty TNHH Kiểu Việt (Tên viết tắt:Liên danh Nam Ngân – Hương Giang – Kiểu Việt) KIỂU VIỆT COMPANY LIMITED Criterion 4 on Construction Progress, the Contractor proposes a schedule until January 15, 2024 to complete the rough part (Foundation and reinforced concrete structure of the category of Surgery, Obstetrics, and Anesthesia Treatment Houses). recovery). Failure to meet progress as required by E-HSMT. Criterion 7 on Warranty, Maintenance, and Maintenance: The Contractor does not state a plan for operating the air conditioning system; Instructions for use, training, operation, technology transfer and exploitation of medical gas systems.
You did not use the site, Click here to remain logged. Timeout: 60 second