220 kV Van Dien transformer station and connection
Project number
PR2400006452-00
Notice type
Real announcement
Project name
220 kV Van Dien transformer station and connection
Project objective
- Meet the electricity needs for the 110 kV grid in the southern city. Hanoi, medium -voltage loads in Thanh Tri and neighboring districts.
- Create a strong link between areas in the electrical system, increase the ability to operate safely and stable for the national electricity system.
- Enhance the stability of power supply, reduce power loss, power loss in the system, improve EVN's production and business efficiency.
Authority
Chairman of the Board of Members EVNNPT
Project management Type
Specialized Management Board - Region
Implementation location
Hanoi
Project approval ID
160/QĐ-HĐTV
Project approval date
09/07/2021
Approval authority
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
20210709 QD phe duyet DADT.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
1.238.646.580.000 VND |
Total amount |
1.238.646.580.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 8 |
2 |
3 |
0 |
3 |
8
|
8 |
288.19
|
6
|