Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION
⚬ Old system: Công ty Dịch vụ Điện lực miền Bắc
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
⚬ 372 Long Boi - Hung Ha
- The following bidding packages have the investor :
⚬ Package: Measure, extract circuit map 372 Long Boi - Hung Ha
⚬ Package: Construction, supply of materials and installation of circuit equipment 372 Long Boi - Hung Ha.
- The following bidding packages have the investor Công ty dịch vụ Điện lực miền Bắc:
⚬ Package: Construction insurance 372 Long Boi - Hung Ha
⚬ Package: Construction supervision and equipment installation 372 Long Boi - Hung Ha
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
10.889.280.925 VND |
||
Total amount |
10.889.280.925 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 0 | 0 | 0 | 0 | 0 | 7 | 0.00 | 5 |