Canh Tang Reservoir, Hoa Binh Province

Watching        
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban Quản lý Đầu tư và Xây dựng Thủy lợi 1
 ⚬ Old system: Ban Quản lý Đầu tư và Xây dựng Thủy lợi 1 làm chủ đầu tư hợp phần xây dựng công trình đầu mối hồ chứa; UBND huyện Lạc Sơn làm chủ đầu tư hợp phần bồi thường, hỗ trợ và tái định cư; UBND tỉnh Hòa Bình quyết định chủ đầu tư hợp phần xây dựng đường ống dẫn n
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban Quản lý Đầu tư và Xây dựng Thủy lợi 1:
 ⚬ Approving the contractor selection plan (phase 9) Canh Tang Reservoir Project, Hoa Binh province

 ⚬ APPROVAL OF CONTRACTOR SELECTION PLAN (PALL 8)

- The following bidding packages have the investor Ban Quản lý Đầu tư và Xây dựng Thủy lợi 1:
 ⚬ Package 07- Technical Design Verification

 ⚬ Package No. 08-Verification of construction cost estimates

 ⚬ Package number 15-Termite treatment

 ⚬ Package No. 10-Building Information Modeling (BIM)

 ⚬ Package No. 05-Survey, make technical design -Construction drawings -Evaluate, test hydraulic model, calculate hydraulics of flood water

 ⚬ Package No. 20-Environmental monitoring and supervision consultancy

 ⚬ Package No. 19- Construction insurance

 ⚬ Package No. 17 -Construction and equipment installation of key clusters

 ⚬ Package No. 35: Verification of technical design-BVTC-DTXDCT and package estimate (part of water pipeline system)

 ⚬ Package 41: Construction and quality inspection of demining, mines and explosives clearance (the part of the water pipeline system)
Click để xem đầy đủClick để thu gọn
Found: 13:02 19/01/2021
Project number
20180504618-03
Notice type
Real announcement
Project name
Canh Tang Reservoir, Hoa Binh Province
Investor ID
vn0104164676
Project Category
Group A
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
số 1456/QĐ-BNN-XD
Project approval date
26/04/2018
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
3.115.000.000.000 VND
2
3.115.000.000.000 VND
3
3.115.000.000.000 VND
4
3.115.000.000.000 VND
Total amount
12.460.000.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 13 0 0 2 30 54.34 11
You did not use the site, Click here to remain logged. Timeout: 60 second