Increase capacity of transformer 220kV-125MVA Ha Tinh 500kV substation to 250MVA

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: EVNNPT
 ⚬ Old system: EVNNPT
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor NATIONAL POWER TRANSMISSION CORPORATION:
 ⚬ The second phase of contractor selection plan Project: Raising capacity of 220 kV - 125 MVA transformer of Ha Tinh 500 kV substation to 250 MVA

- The following contractor selection plans have the investor National Power Transmission Corporation:
 ⚬ Approve the adjustment of the contractor selection plan for phase 2 Project: Increasing the capacity of the 220kV-125MVA transformer at the 500kV Ha Tinh substation to 250MVA

- The following contractor selection plans have the investor THE POWER TRANSMISSION PROJECTS MANAGEMENT BOARD - BRANCH OF THE NATIONAL POWER TRANSMISSION CORPORATION:
 ⚬ 1st phase of planning (project preparation phase) Project “Upgrading capacity of 220kV-125MVA transformer of Ha Tinh 500kV substation to 250MVA”

- The following bidding packages have the investor NATIONAL POWER TRANSMISSION CORPORATION:
 ⚬ Package No. 5: Supply and transportation of 220 kV - 250 MVA transformers

 ⚬ Package No. 11: Construction supervision consultancy and installation of materials and equipment

 ⚬ Package 6: Supply and transport the first VTTB

 ⚬ Package 10: Construction insurance

 ⚬ Package No. 7: Supply, transportation, installation of secondary VTTB and SCADA collection center

- The following bidding packages have the investor The Power Transmission Project Managment Board - Branch of NPT:
 ⚬ Package No. 1: Providing consulting services for preparation of feasibility study reports
Click để xem đầy đủClick để thu gọn
Found: 15:46 30/03/2022
Project number
20220377398-00
Notice type
Real announcement
Project name
Increase capacity of transformer 220kV-125MVA Ha Tinh 500kV substation to 250MVA
Investor
Investor ID
vnz000012981
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
89/QĐ-EVNNPT
Project approval date
18/01/2022

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
71.494.000.000 VND
2
71.494.000.000 VND
3
694.930.000 VND
Total amount
143.682.930.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
5 2 4 0 4 15 2 134.23 6
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8361 Projects are waiting for contractors
  • 1157 Tender notices posted in the last 24 hours
  • 1869 Contractor selection plan posted in the last 24 hours
  • 24377 Tender notices posted in the past month
  • 38634 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second