Additional equipment, replacing server equipment, archiving for internal management needs of Lam Dong Power Company

Watching          
Found: 11:22 14/07/2025
Project number
PR2500041665-00
Notice type
Real announcement
Project name
Additional equipment, replacing server equipment, archiving for internal management needs of Lam Dong Power Company
Project objective
Supplementing and optimizing server infrastructure at Power Company to improve the efficiency of resource exploitation for shared applications of the Group and Corporation; Ensuring the shared applications of the Group, Corporation and Power Companies to operate stably, database safety (database); Increasing stability and safety for applications, common data and operating by mechanism (1+1) and high readiness: CMIS 2.0 system, TV conferences, remote measurement data collection ...; Guaranteed lower frequency
Investor ID
vnz000022091
Authority
Director Phan Sy Duy
Project duration
90 Day
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Phường Xuân Trường - Đà Lạt, Lam Dong province
Investment Total Value
To view full information please Login or Register
Project approval ID
801/QĐ-PCLĐ
Project approval date
12/06/2025
Approval authority
Công ty Điện lực Lâm Đồng
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
2.585.310.000 VND
Total amount
2.585.310.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 0 0 0 0 1 0 2.59 1
You did not use the site, Click here to remain logged. Timeout: 60 second