DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: SOUTHERN VIETNAM POWER PROJECTS MANAGEMENT BOARD
⚬ Old system: National Power Transmission Corporation
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor National Power Transmission Corporation:
⚬ Contractor selection plan for the T2 Cam Ranh investment implementation phase
- The following bidding packages have the investor The Southern Vietnam Power Projects Management Board:
⚬ Package 5: Providing consulting services to verify technical design and construction cost estimate.
⚬ Package 3: Providing consulting services for construction survey, making technical design - construction cost estimate, construction drawing, bidding document.
⚬ Package 11: Surveying and setting up landmarks, measuring and drawing cadastral maps and consulting on compensation and site clearance.
⚬ Package 9: Construction and installation of the Station, including transporting the first VTTB to the site (excluding the installation of the transformer and the first + second part) calibration experiment.
⚬ Package No. 7: Supply of VTTB of the first substation (including testing and sample approval) and conductors, lightning protection wires, insulated accessories, OPGW fiber optic cables and accessories for connection lines.
⚬ Package No. 8: Supply and installation of secondary VTTB, configuration of protection control system, SCADA law enforcement system, including testing to calibrate SCADA law enforcement system and installation, verification, and testing of meter connection to the system
⚬ Package 12: Insurance of works during construction.
⚬ Package 6: Supply and transport 220 kV-250 MVA transformer and 110 kV-40 MVA transformer.
⚬ Package 18: Consulting and installation supervision of transformers 220 kV-250 MVA, 110 kV-40 MVA and first + second calibration experiment supervision (excluding administrative work of TTLLSCADA).
⚬ Package No. 10: Construction and installation of connection lines, including providing connection poles and transporting conductors, lightning protection wires, insulated accessories, OPGW fiber optic cables and accessories to the construction site.
⚬ Package 15: Auditing the completed project settlement report.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
0 VND |
||
Total amount |
0 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 18 | 0.00 | 12 |