There has been a decision to approve the investment project
Approval date
15/01/2019
Approval ID
số 0074/Đ-EVNNPT
List of Bid:
Number of packages: 18
1.Package 3: Providing consulting services for construction survey, making technical design - construction cost estimate, construction drawing, bidding document.
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2019
Contract Type
All in one
Prequalification
No
Implementation location
5.Package 7: Supplying the first VTTB (including testing and approval of samples) and conductors, lightning protection wires, accessory insulators, OPGW optical cables accessories for connection lines.
Open bidding, international, no pre-qualification, no online bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2019
Contract Type
All in one
Prequalification
No
Implementation location
6.Package 8: Supply and installation of secondary VTTB, configuration of protection control system, TTLL SCADA, including calibration test of TTLL SCADA and installation, inspection and testing of meter connection to the system
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2019
Contract Type
All in one
Prequalification
No
Implementation location
7.Package 9: Construction and installation of the Station, including transporting the first VTTB to the site (excluding the installation of the transformer and the first + second part) calibration experiment.
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July 2019
Contract Type
According to fixed unit price
Prequalification
No
Implementation location
8.Package 10: Construction and installation of connection lines, including supply of connection poles and transportation of conductors, lightning conductors, accessory insulators, accessory OPGW optical cables to the construction site.
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
Implementation location
14.Package 16: Installation of transformers 220 kV-250 MVA, 110 kV-40 MVA and first + second calibration test (excluding administrative work of TTLLSCADA).
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2020
Contract Type
All in one
Prequalification
No
Implementation location
15.Package 17: Construction supervision consultancy, installation and calibration testing of TTLL SCADA (excluding installation supervision of transformers 220 kV-250 MVA, 110 kV-40 MVA and supervision of calibration tests. ).
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2019
Contract Type
All in one
Prequalification
No
Implementation location
16.Package 18: Consulting and installation supervision of transformers 220 kV-250 MVA, 110 kV-40 MVA and first + second calibration experiment supervision (excluding administrative work of TTLLSCADA).
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2020
Contract Type
All in one
Prequalification
No
Implementation location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for the T2 Cam Ranh investment implementation phase". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for the T2 Cam Ranh investment implementation phase" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.