Chau Duc 220kV substation

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD
 ⚬ Old system: National Power Transmission Corporation
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor National Power Transmission Corporation:
 ⚬ Plan to supplement Chau Duc 220kV substation project

 ⚬ Contractor selection plan to adjust Chau Duc 220kV substation project

- The following bidding packages have the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD:
 ⚬ Package No. 8: Construction insurance during construction.

 ⚬ Package 7: Construction and installation of substations and connections, including supply of the first VTTB connection and transport poles, conductors, lightning protection wires, accessory insulation, OPGW optical cables, accessories of the transmission line connecting to the construction site

 ⚬ Package 6: Supply and installation of materials and equipment, configuration of SCADA communication and protection control system” including testing of telemetry system (not including calibration test)

 ⚬ Package 4: Supply and transport 220kV-250MVA transformer.

 ⚬ Package No. 14: Consulting and installation supervision of 220kV-250MVA transformer and monitoring of calibration experiments (first + second).

 ⚬ Package No. 5: Providing VTTB of the first substation (including testing and sample approval) and conductors, lightning protection wires, insulated accessories, OPGW fiber optic cables and accessories for connection lines.

 ⚬ Package 11: Auditing the completed project's finalization report.
Click để xem đầy đủClick để thu gọn
Found: 12:21 19/01/2021
Project number
20180374956-00
Notice type
Real announcement
Project name
Chau Duc 220kV substation
Investor ID
vnz000010699
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
2962/QĐ-BCT
Project approval date
31/07/2017
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
280.705.431.000 VND
2
280.705.431.000 VND
Total amount
561.410.862.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 12 0.00 8
You did not use the site, Click here to remain logged. Timeout: 60 second