DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD
⚬ Old system: National Power Transmission Corporation
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor National Power Transmission Corporation:
⚬ Plan to supplement Chau Duc 220kV substation project
⚬ Contractor selection plan to adjust Chau Duc 220kV substation project
- The following bidding packages have the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD:
⚬ Package No. 8: Construction insurance during construction.
⚬ Package 7: Construction and installation of substations and connections, including supply of the first VTTB connection and transport poles, conductors, lightning protection wires, accessory insulation, OPGW optical cables, accessories of the transmission line connecting to the construction site
⚬ Package 6: Supply and installation of materials and equipment, configuration of SCADA communication and protection control system” including testing of telemetry system (not including calibration test)
⚬ Package 4: Supply and transport 220kV-250MVA transformer.
⚬ Package No. 14: Consulting and installation supervision of 220kV-250MVA transformer and monitoring of calibration experiments (first + second).
⚬ Package No. 5: Providing VTTB of the first substation (including testing and sample approval) and conductors, lightning protection wires, insulated accessories, OPGW fiber optic cables and accessories for connection lines.
⚬ Package 11: Auditing the completed project's finalization report.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
280.705.431.000 VND |
||
|
2
|
280.705.431.000 VND |
||
Total amount |
561.410.862.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 12 | 0.00 | 8 |