Completing technical infrastructure and developing the cultural and tourism village model
Project number
PR2300062541-00
Notice type
Real announcement
Project name
Completing technical infrastructure and developing the cultural and tourism village model
Project objective
Investing in construction of electrical lighting systems; internal roads; landscape improvement and auxiliary items to support the development of tourism products, cultural tourism village model, complete technical infrastructure, promote local socio-economic development and contribute to fulfilling newly advanced rural commune criteria.
Project management Type
The investor hires a project management consultant
Implementation location
Huyện Quảng Trạch, Quảng Trị
Project approval ID
3482/QĐ-UBND
Project approval date
06/12/2023
Approval authority
UBND tỉnh Quảng Bình
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
3482QĐ(06.12.2023_10h10p35)_signed.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
5.000.000.000 VND |
Total amount |
5.000.000.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
1 |
4 |
0 |
1 |
1
|
5 |
4.45
|
2
|